By Nov. 9th the following things MUST be accomplished.

1. CW beam to the inline dump 85uA from A laser, 1uA from the D laser

2. Wien setup for alignment of polarization to Hall-A on 5-pass

3. Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6

4. Beam matched in the inj. chicane, ready for transport into the NL.

5. All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane

6. RF calibration tool fully developed (anticipate Nov. 2-7 DAYS)

7. quad centering tool fully developed (anticipate Nov. 2-7 DAYS)

Injector Tests and Calendar media:150929_InjectorTestList.xlsx media:150929_InjectorTestList.pdf