April 28, 2016 - Mott Group Meeting

From Ciswikidb
Revision as of 11:54, 11 April 2016 by Grames (talk | contribs)
Jump to navigation Jump to search

We will meet Thursday, April 28 at 12pm EST in TL-2236.

Tasks and Writing Assignments

  • Tasks
    • (Joe) - finalize polarimeter geometry and detector acceptance.
    • (Joe, Riad) finalize dipole map and compute beam momentum for Runs I/II
    • (Xavi) Calculate the final tables of S(E,q,DE,Dq) needed for the simulation and analysis results.
    • (Marty) Document Geant4 Mott package, cross-train, implement Xavi's tables for final simulation, provide tech-support
    • (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; summarize S_effective vs. thickness for Run I/II
    • (Daniel) Revisit asymmetry vs. energy results
  • Writing Assignments
    • (Xavi) theory - TN on wiki
    • (Marty) Geant4 simulation - draft TN on wiki, final by April 19
    • (Matt) CEBAF injector, by April 22
    • (Tim, Marty, Daniel) TN on Run I/II target thickness, by April 22
    • (Joe) Beam measurements, by May 6
    • (Riad) DAQ and PQB, by May 7

Agenda

TBD

Blue Jeans and Wiki

Toll Free Phone number: 1-888-240-2560
Int'l Call Phone numbers: http://bluejeans.com/numbers
Meeting ID: 958336006#
Web connection for desktop sharing: https://bluejeans.com/958336006
Wiki: https://wiki.jlab.org/ciswiki/index.php/April_28,_2016_-_Mott_Group_Meeting