May 13, 2016 - Mott Group Meeting
Jump to navigation
Jump to search
We will meet Friday, May 13 at Noon EST in TL-2236.
Updates
- Recap of G4Mott discussion and plans moving forward
- Documenting polarimeter construction
- Slides from meeting with Danny media:160513_Mott_Drawings.pptx
- Marcy, Riad, Joe - Writing TN on the Mott chamber assembly media:MottConstruction-TN_v0.docx
- Status of dipole magnet field
- Status on electron beam measurements for Runs I and II
- Run2 Rates vs Beam Energy and Run1 Predicted Beam Energy media:160513_Moser.pdf
- Important future dates (SPIN 2016, Marty's defense, self-imposed deadline to submit Phys. Rev. C)
Analysis Plan Sequence
- (Joe) - finalize polarimeter geometry and detector acceptance.
- (Joe, Riad) finalize dipole map and compute beam momentum for Runs I/II
- (Xavi) Calculate the final tables of S(E,q,DE,Dq) needed for the simulation and analysis results.
- (Marty) Document Geant4 Mott package, cross-train, implement Xavi's tables for final simulation, provide tech-support
- (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; summarize S_effective vs. thickness for Run I/II
- (Daniel) Revisit asymmetry vs. energy results
- (Daniel, Riad) Rate analysis for Runs I/II
Blue Jeans and Wiki
Toll Free Phone number: 1-888-240-2560 Int'l Call Phone numbers: http://bluejeans.com/numbers Meeting ID: 618889275# Web connection for desktop sharing: https://bluejeans.com/618889275 Wiki: https://wiki.jlab.org/ciswiki/index.php/May_13,_2016_-_Mott_Group_Meeting