Difference between revisions of "Apr 18, 2023 - CIS Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Agenda == * Gabriel - GTS update ====SAD jobs for the next ==== :* Joe - gun alignment :* Carlos - HV processing :* Marcy - remaining vacuum tasks :* Steve - status new s...")
 
Line 1: Line 1:
 
== Agenda ==
 
== Agenda ==
  
* Gabriel - GTS update
+
==== GTS ====
 +
* Gabriel HV insulator test
  
====SAD jobs for the next ====
+
==== SAD Gun Jobs ====
:* Joe - gun alignment
+
* Joe - gun alignment
:* Carlos - HV processing
+
* Carlos - HV processing
:* Marcy - remaining vacuum tasks
+
* Marcy - remaining vacuum tasks
:* Steve - status new seed laser
+
* Steve - status new seed laser
:* Max - ready for beam tests?
+
* Max - ready for beam tests?
:* Riad (if in) - update on Moller tasks
+
* Riad (if in) - update on Moller tasks
:* Greg - ready for IPAC?
+
* Greg - ready for IPAC?
:* Other updates?
+
* Other updates?
  
* Upcoming meetings/travel
+
==== Upcoming meetings/travel ====
:* May - IPAC'23 (Greg/Aziz/Joe) 5-13 and LCWS 15-19 (Andriy/Carlos)  
+
* May
:* Jun - USPAS (Max), APS DAMOP Meeting 5-9 (Riad/Matt Grau)  
+
:* 5-13, IPAC'23 (Greg/Aziz/Joe)
:* Jul - ?
+
:* 15-19 LCWS 15-19 (Andriy/Carlos)  
** Aug - ?
+
:* Jun - USPAS (Max)
** Sep - IBIC (Max)
+
:* APS DAMOP Meeting 5-9 (Riad/Matt Grau)  
 +
* Jul
 +
:* Summer PES talk (Riad)
 +
:* Summer e+ talk (Yves)
 +
* Aug
 +
:* None
 +
* Sep
 +
:* IBIC (Max)
  
 
* CEBAF PES jobs...
 
* CEBAF PES jobs...

Revision as of 08:09, 18 April 2023

Agenda

GTS

  • Gabriel HV insulator test

SAD Gun Jobs

  • Joe - gun alignment
  • Carlos - HV processing
  • Marcy - remaining vacuum tasks
  • Steve - status new seed laser
  • Max - ready for beam tests?
  • Riad (if in) - update on Moller tasks
  • Greg - ready for IPAC?
  • Other updates?

Upcoming meetings/travel

  • May
  • 5-13, IPAC'23 (Greg/Aziz/Joe)
  • 15-19 LCWS 15-19 (Andriy/Carlos)
  • Jun - USPAS (Max)
  • APS DAMOP Meeting 5-9 (Riad/Matt Grau)
  • Jul
  • Summer PES talk (Riad)
  • Summer e+ talk (Yves)
  • Aug
  • None
  • Sep
  • IBIC (Max)
  • CEBAF PES jobs...
  • 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
  • Fix photocathode activation Keithley 485 Picoammeter - bad display
  • 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
  • Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
  • Hall A laser jobs - remove ML, install repaired 250/499 board
  • KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
  • Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C
  • UITF rest of this year...
  • Now operates like GTS with an OSP, Jessica safety warden and Joe POC
  • Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
  • Student updates
    • Sohaib/REU - spin tracking for CEBAF/Ce+BAF
    • Sami - returned to France, writing his thesis
    • Sunil - wants 15 Mhz bunches this summer to test his model of KL
    • Aziz
    • Greg
    • Kawser