Difference between revisions of "Apr 18, 2023 - CIS Group Meeting"
Jump to navigation
Jump to search
(Created page with "== Agenda == * Gabriel - GTS update ====SAD jobs for the next ==== :* Joe - gun alignment :* Carlos - HV processing :* Marcy - remaining vacuum tasks :* Steve - status new s...") |
|||
Line 1: | Line 1: | ||
== Agenda == | == Agenda == | ||
− | * Gabriel | + | ==== GTS ==== |
+ | * Gabriel HV insulator test | ||
− | ====SAD | + | ==== SAD Gun Jobs ==== |
− | + | * Joe - gun alignment | |
− | + | * Carlos - HV processing | |
− | + | * Marcy - remaining vacuum tasks | |
− | + | * Steve - status new seed laser | |
− | + | * Max - ready for beam tests? | |
− | + | * Riad (if in) - update on Moller tasks | |
− | + | * Greg - ready for IPAC? | |
− | + | * Other updates? | |
− | + | ==== Upcoming meetings/travel ==== | |
− | :* | + | * May |
− | :* Jun - USPAS (Max) | + | :* 5-13, IPAC'23 (Greg/Aziz/Joe) |
− | + | :* 15-19 LCWS 15-19 (Andriy/Carlos) | |
− | ** Aug | + | :* Jun - USPAS (Max) |
− | ** Sep | + | :* APS DAMOP Meeting 5-9 (Riad/Matt Grau) |
+ | * Jul | ||
+ | :* Summer PES talk (Riad) | ||
+ | :* Summer e+ talk (Yves) | ||
+ | * Aug | ||
+ | :* None | ||
+ | * Sep | ||
+ | :* IBIC (Max) | ||
* CEBAF PES jobs... | * CEBAF PES jobs... |
Revision as of 08:09, 18 April 2023
Agenda
GTS
- Gabriel HV insulator test
SAD Gun Jobs
- Joe - gun alignment
- Carlos - HV processing
- Marcy - remaining vacuum tasks
- Steve - status new seed laser
- Max - ready for beam tests?
- Riad (if in) - update on Moller tasks
- Greg - ready for IPAC?
- Other updates?
Upcoming meetings/travel
- May
- 5-13, IPAC'23 (Greg/Aziz/Joe)
- 15-19 LCWS 15-19 (Andriy/Carlos)
- Jun - USPAS (Max)
- APS DAMOP Meeting 5-9 (Riad/Matt Grau)
- Jul
- Summer PES talk (Riad)
- Summer e+ talk (Yves)
- Aug
- None
- Sep
- IBIC (Max)
- CEBAF PES jobs...
- 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
- Fix photocathode activation Keithley 485 Picoammeter - bad display
- 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
- Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
- Hall A laser jobs - remove ML, install repaired 250/499 board
- KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
- Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C
- UITF rest of this year...
- Now operates like GTS with an OSP, Jessica safety warden and Joe POC
- Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
- Student updates
- Sohaib/REU - spin tracking for CEBAF/Ce+BAF
- Sami - returned to France, writing his thesis
- Sunil - wants 15 Mhz bunches this summer to test his model of KL
- Aziz
- Greg
- Kawser