Difference between revisions of "Apr 18, 2023 - CIS Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 5: Line 5:
  
 
==== SAD Gun Jobs ====
 
==== SAD Gun Jobs ====
* Joe - gun alignment
+
* Joe - gun table alignment
* Carlos - HV processing
+
* Carlos - HV OSP, read for conditioning
* Marcy - remaining vacuum tasks
+
* Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region
* Steve - status new seed laser
+
* Steve - Hall A laser, LLRF gone early June
 
* Max - ready for beam tests?
 
* Max - ready for beam tests?
* Riad - update on Moller tasks
+
* Riad - 200 kV Wien - 20 Amp PS, update on Moller tasks (IA, RPT, grounding), Keithley 485 picoameter
* Greg - ready for IPAC?
+
* Shukui - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
* Other updates?
 
  
 
==== Upcoming meetings/travel ====
 
==== Upcoming meetings/travel ====
Line 28: Line 27:
 
* Sep
 
* Sep
 
:* IBIC (Max)
 
:* IBIC (Max)
 
* CEBAF PES jobs...
 
:* 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
 
:* Fix photocathode activation Keithley 485 Picoammeter - bad display
 
:* 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
 
:* Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
 
:* Hall A laser jobs - remove ML, install repaired 250/499 board
 
:* KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
 
:* Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C
 
 
* UITF rest of this year...
 
:* Now operates like GTS with an OSP, Jessica safety warden and Joe POC
 
:* Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
 
 
* Student updates
 
** Sohaib/REU - spin tracking for CEBAF/Ce+BAF
 
** Sami - returned to France, writing his thesis
 
** Sunil - wants 15 Mhz bunches this summer to test his model of KL
 
** Aziz
 
** Greg
 
** Kawser
 

Revision as of 08:25, 18 April 2023

Agenda

GTS

  • Gabriel HV insulator test

SAD Gun Jobs

  • Joe - gun table alignment
  • Carlos - HV OSP, read for conditioning
  • Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region
  • Steve - Hall A laser, LLRF gone early June
  • Max - ready for beam tests?
  • Riad - 200 kV Wien - 20 Amp PS, update on Moller tasks (IA, RPT, grounding), Keithley 485 picoameter
  • Shukui - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size

Upcoming meetings/travel

  • May
  • 5-13, IPAC'23 (Greg/Aziz/Joe)
  • 15-19 LCWS (Andriy/Carlos)
  • Jun
  • USPAS (Max)
  • 5-9 APS DAMOP Meeting (Riad/Matt Grau)
  • Jul
  • Summer PES talk (Riad)
  • Summer e+ talk (Yves)
  • Aug
  • None
  • Sep
  • IBIC (Max)