Difference between revisions of "Bubble Chamber Meeting Thursday April 19, 2018"

From Ciswikidb
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
  Phone number: 1-888-240-2560
 
  Phone number: 1-888-240-2560
 
  Meeting ID: 3528502673#
 
  Meeting ID: 3528502673#
Moderator Passcode: 5978#
 
 
  Meeting URL: http://bluejeans.com/3528502673
 
  Meeting URL: http://bluejeans.com/3528502673
  
  
===Agenda===
+
=== Accelerator Schedule===
  
* Whitney Armstrong - GEANT4 Simulation
+
* Physics run extended to May 6
  
 +
* Completely new schedule: [[media:SAD-2018-SCHEDULE.xlsx]]
  
* Seamus Riordan - <sup>19</sup>F(γ,α)<sup>15</sup>N Energy Width Systematic Studies
+
* Detailed Schedule (see page 2 for bubble): [[media:DoIt_rev1_180412.docx]] [[media:DoIt_rev1_180412.pdf]]
  
 +
* Cryogenic plants are going to 4K on May 6
  
* [[Accelerator Test Review]]
+
* Bubble will run at 4K - we will save time if we stay at 4K instead of waiting to go back to 2K (by Friday May 11th).
  
  
* Bubble Chamber Run Plan
+
===Agenda===
 
 
  
 
* '''Questions:'''
 
* '''Questions:'''
Line 28: Line 28:
  
 
* '''Open House:'''
 
* '''Open House:'''
:: JLab Open House is on May 19, 2018
+
:: JLab Open House is on May 19, 2018
:: Bubble Chamber display (Poster and Animation) is planned at UITF North Cave
 
 
 
 
 
=== Accelerator Schedule===
 
 
 
* Physics run extended to May 6
 
 
 
* Cryogenic plants are going to 4K on May 6
 
 
 
* Can Bubble run at 4K? We could save time if we stay at 4K instead of waiting to go back to 2K (by Friday May 11th).
 
 
 
* Completely new schedule: [[media:SAD-2018-SCHEDULE.xlsx]]
 
 
 
* Detailed Schedule (see page 2 for bubble): [[media:DoIt_rev1_180412.docx]] [[media:DoIt_rev1_180412.pdf]]
 

Latest revision as of 14:01, 26 April 2018

We will meet in TL 2236 on Thursday April 19 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Accelerator Schedule

  • Physics run extended to May 6
  • Cryogenic plants are going to 4K on May 6
  • Bubble will run at 4K - we will save time if we stay at 4K instead of waiting to go back to 2K (by Friday May 11th).


Agenda

  • Questions:
Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
If yes, what special considerations will need to be taken to moth-ball the experiment?


  • Open House:
JLab Open House is on May 19, 2018