Difference between revisions of "Bubble Chamber Meeting Thursday April 26, 2018"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "We will meet in TL 2236 on Thursday April 19 at 4:00 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Pho...")
 
 
(20 intermediate revisions by 2 users not shown)
Line 1: Line 1:
We will meet in TL 2236 on Thursday April 19 at 4:00 pm EST.
+
We will meet in TL 2236 on Thursday April 26 at 4:00 pm EST.
  
 
== For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. ==
 
== For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. ==
 
  Phone number: 1-888-240-2560
 
  Phone number: 1-888-240-2560
 
  Meeting ID: 3528502673#
 
  Meeting ID: 3528502673#
Moderator Passcode: 5978#
 
 
  Meeting URL: http://bluejeans.com/3528502673
 
  Meeting URL: http://bluejeans.com/3528502673
 
 
=== Accelerator Schedule===
 
 
* Physics run extended to May 6
 
 
* Completely new schedule: [[media:SAD-2018-SCHEDULE.xlsx]]
 
 
* Detailed Schedule (see page 2 for bubble): [[media:DoIt_rev1_180412.docx]] [[media:DoIt_rev1_180412.pdf]]
 
 
* Cryogenic plants are going to 4K on May 6
 
 
* Bubble will run at 4K - we will save time if we stay at 4K instead of waiting to go back to 2K (by Friday May 11th).
 
  
  
 
===Outside Visitors===
 
===Outside Visitors===
 
# Kevin (May 7 - 19)
 
# Thomas (May 7 - 14)
 
#
 
  
  
 
===Agenda===
 
===Agenda===
  
* New procedure for operations: [[media:TGT-PROC-18-001.docx]]
+
* Beam studies (4/24/18) - Alicia, Joe, Riad [[media:180426_beam_dryrun.docx]] [[media:180426_beam_dryrun.pdf]]  
 
 
 
 
* [[Accelerator Test Review]]
 
  
  
* Bubble Chamber Run Plan
+
* Installation Plan ([https://accweb.acc.jlab.org/calendar/ SAD Calendar)]
 +
: Mon/7 - No lockups, installation group, install harp + break
 +
: Tue/8 - No lockups, S&A?
 +
: Wed/9 - No lockups, S&A?
 +
: Thu/10 - SWING lockup possible, anticipate 4K
 +
: Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown ready)
  
  
* '''Questions:'''
+
* New procedure for operations, '''''Argonne Bubble Chamber Operations for Engineering Runs''''': [[media:TGT-PROC-18-001.pdf]]
:: Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
 
:: If yes, what special considerations will need to be taken to moth-ball the experiment?
 
  
  
* '''Open House:'''
+
* '''''5D line dump has been approved for 1 kW operation'''''
:: JLab Open House is on May 19, 2018 
 
:: Bubble Chamber display (Poster and Animation) is planned at UITF North Cave
 

Latest revision as of 11:46, 3 May 2018

We will meet in TL 2236 on Thursday April 26 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Outside Visitors

Agenda


Mon/7 - No lockups, installation group, install harp + break
Tue/8 - No lockups, S&A?
Wed/9 - No lockups, S&A?
Thu/10 - SWING lockup possible, anticipate 4K
Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown ready)



  • 5D line dump has been approved for 1 kW operation