Difference between revisions of "Bubble Chamber Meeting Thursday April 26, 2018"
Jump to navigation
Jump to search
(11 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
Phone number: 1-888-240-2560 | Phone number: 1-888-240-2560 | ||
Meeting ID: 3528502673# | Meeting ID: 3528502673# | ||
− | |||
Meeting URL: http://bluejeans.com/3528502673 | Meeting URL: http://bluejeans.com/3528502673 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Outside Visitors=== | ===Outside Visitors=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Agenda=== | ===Agenda=== | ||
− | * | + | * Beam studies (4/24/18) - Alicia, Joe, Riad [[media:180426_beam_dryrun.docx]] [[media:180426_beam_dryrun.pdf]] |
− | |||
− | |||
− | |||
− | |||
* Installation Plan ([https://accweb.acc.jlab.org/calendar/ SAD Calendar)] | * Installation Plan ([https://accweb.acc.jlab.org/calendar/ SAD Calendar)] | ||
Line 46: | Line 20: | ||
: Wed/9 - No lockups, S&A? | : Wed/9 - No lockups, S&A? | ||
: Thu/10 - SWING lockup possible, anticipate 4K | : Thu/10 - SWING lockup possible, anticipate 4K | ||
− | : Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown | + | : Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown ready) |
− | |||
− | * '' | + | * New procedure for operations, '''''Argonne Bubble Chamber Operations for Engineering Runs''''': [[media:TGT-PROC-18-001.pdf]] |
− | |||
− | :: | ||
− | * ''' | + | * '''''5D line dump has been approved for 1 kW operation''''' |
− | |||
− |
Latest revision as of 11:46, 3 May 2018
We will meet in TL 2236 on Thursday April 26 at 4:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Outside Visitors
Agenda
- Beam studies (4/24/18) - Alicia, Joe, Riad media:180426_beam_dryrun.docx media:180426_beam_dryrun.pdf
- Installation Plan (SAD Calendar)
- Mon/7 - No lockups, installation group, install harp + break
- Tue/8 - No lockups, S&A?
- Wed/9 - No lockups, S&A?
- Thu/10 - SWING lockup possible, anticipate 4K
- Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown ready)
- New procedure for operations, Argonne Bubble Chamber Operations for Engineering Runs: media:TGT-PROC-18-001.pdf
- 5D line dump has been approved for 1 kW operation