Difference between revisions of "Bubble Chamber Meeting Thursday April 26, 2018"

From Ciswikidb
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
  Phone number: 1-888-240-2560
 
  Phone number: 1-888-240-2560
 
  Meeting ID: 3528502673#
 
  Meeting ID: 3528502673#
Moderator Passcode: 5978#
 
 
  Meeting URL: http://bluejeans.com/3528502673
 
  Meeting URL: http://bluejeans.com/3528502673
  
  
 
===Outside Visitors===
 
===Outside Visitors===
 
# Kevin (May 7 - 19)
 
# Thomas (May 7 - 14)
 
# Brad (May 7 - 18)
 
# David (May 10 - 19)
 
# Claudio ()
 
# Ernst ()
 
# Whit ()
 
# Seamus ()
 
 
 
  - Tunnel Worker Safety Pre-brief (SAF132) walk-through part of the training is scheduled on May ? at ? (meet in MCC).
 
  
  
Line 39: Line 26:
  
  
* [[Accelerator Test Review]]
+
* '''''5D line dump has been approved for 1 kW operation'''''
 
 
 
 
* Bubble Chamber Run Plan
 
 
 
 
 
* '''Questions:'''
 
:: Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
 
:: If yes, what special considerations will need to be taken to moth-ball the experiment?
 
 
 
 
 
* '''Open House:'''
 
:: JLab Open House is on May 19, 2018 
 
:: Bubble Chamber display (Poster and Animation) is planned in MCC
 

Latest revision as of 11:46, 3 May 2018

We will meet in TL 2236 on Thursday April 26 at 4:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Outside Visitors

Agenda


Mon/7 - No lockups, installation group, install harp + break
Tue/8 - No lockups, S&A?
Wed/9 - No lockups, S&A?
Thu/10 - SWING lockup possible, anticipate 4K
Fri/11 - Anticipate 2K pumpdown and no lockup on DAY, 24/7 Ops support begins on SWING (w/ 2K or 4K until pumpdown ready)



  • 5D line dump has been approved for 1 kW operation