1- Bubble Chamber progress at JLab
 
1- Bubble Chamber progress at JLab
  
2- Laser Shuttering  
+
2- Laser Shuttering:
 
* Would like to use a mechanical shutter (100% extinction)
 
* Would like to use a mechanical shutter (100% extinction)
 
** John Hansknecht will build a control box that uses TLL signal on BNC cable  (TTL=high=close=beam OFF, TLL=low=open=beam ON)
 
** John Hansknecht will build a control box that uses TLL signal on BNC cable  (TTL=high=close=beam OFF, TLL=low=open=beam ON)
Line 22: Line 22:
 
** repurposes cell in optical path, so more invasive and more work installing HV driver, control circuit)
 
** repurposes cell in optical path, so more invasive and more work installing HV driver, control circuit)
  
3. Proposed run schedule week of August 10
+
3. Beam test of 5D line in the week of August 10
 
 
* Tue, August 11: Turn on gun, commission new lasers, beam to FC1  (Joe Grames).
 
*  Wed, August 12: Beam to FC2 and 5D dump (Yan, Riad).
 
* Thursday, August 13: Check beam optics to 5D (Chris). Measure beam  energy (Riad).
 
* Friday, August 14: Mott and photocathode Analyzing power (Joe ,Riad).
 
* Saturday, August 15: Measure beam energy and beam current (Riad).
 

Revision as of 17:18, 5 August 2015

We will meet in TL 2221 on Wednesday August 5 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at JLab

2- Laser Shuttering:

  • Would like to use a mechanical shutter (100% extinction)
    • John Hansknecht will build a control box that uses TLL signal on BNC cable (TTL=high=close=beam OFF, TLL=low=open=beam ON)
    • LST400: on-hand, time to open (~30ms), time to close (~30ms), large aperture 8mm
    • LST202: purchase, time to open (~1.3ms), time to close (~1.5ms), small aperture 2.3mm (recommend <1mm beam)
  • Alternatively use an electro-optic shutter (>1000:1 extinction, but fast rise/fall times <5ns)
    • repurposes cell in optical path, so more invasive and more work installing HV driver, control circuit)

3. Beam test of 5D line in the week of August 10