Difference between revisions of "Bubble Chamber Meeting Wednesday May 18, 2016"
Jump to navigation
Jump to search
(Created page with "We will meet in TL 2221 on Wednesday May 18 at 3:30 pm EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phon...") |
|||
Line 23: | Line 23: | ||
3- Bubble Chamber work at ANL | 3- Bubble Chamber work at ANL | ||
− | 4- | + | 4- Increase distance between radiator glass cell from 10” to as much as 40”? |
− | 5- | + | 5- Beam Analysis: energy and position – energy spread and beam size |
− | 6- New beamline design with sweep magnet | + | 6- Measuring <sup>19</sup>F(γ,α)<sup>15</sup>N |
+ | |||
+ | 7- New beamline design with sweep magnet |
Revision as of 07:42, 16 May 2016
We will meet in TL 2221 on Wednesday May 18 at 3:30 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Moderator Passcode: 5978# Meeting URL: http://bluejeans.com/3528502673
Agenda:
0- Bubble Chamber at Jefferson Lab Open House, Saturday April 30, 2016:
- media:bubble_OpenHouse_April2016.pdf
- media:bubble_OpenHouse_April2016.pptx
- media:OpenHouse_photo.JPG
1- Test Run II Schedule:
- Bubble Installation: August 15 – August 18, 2016: Day shift only
- Bubble Run: Aug 19 – Sept 2, 2016
2- Approved Bubble Chamber TOSP expired on Dec 8, 2015. Need to re-submit a new one for approval with addendum of changes to chamber and 100 µA beam current.
3- Bubble Chamber work at ANL
4- Increase distance between radiator glass cell from 10” to as much as 40”?
5- Beam Analysis: energy and position – energy spread and beam size
6- Measuring 19F(γ,α)15N
7- New beamline design with sweep magnet