Bubble Demo ME May 9, 2014

From Ciswikidb
Revision as of 16:23, 1 May 2014 by Grames (talk | contribs)
Jump to navigation Jump to search

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Are DL drawings signed off?
(Tim/Joe) Identify vendor for DL?
(Tim/Joe/Shaun) Identify vendor for DL alignment plate?

Beamline layout

(Joe/Shaun) Part list
re-use from tunnel
on shelf
buy part
design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions

Beamline components

(Joe) Are MBH corrector strengths sufficient?
(Joe M.) Is radiator cooling flange sufficient?

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions