Bubble Demo ME May 9, 2014

From Ciswikidb
Revision as of 08:46, 8 May 2014 by Grames (talk | contribs)
Jump to navigation Jump to search

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Finalize/sign drawings
(Tim) Identify vendor for DL?
(Tim/Joe/Shaun ?) Identify vendor for DL alignment plate

Beamline layout

(Shaun) Send Joe copy of layout
(Joe) Help categorize component inventory
*re-use from tunnel
*on shelf
*buy part
*design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions
(Grames) Radiator design change
media:140508_RadiatorConcept.pptx media:140508_RadiatorConcept.pdf

Beamline components

(Joe) Are MBH corrector strengths sufficient?
(Joe M.) Is radiator cooling flange sufficient?

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions