Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to: navigation, search
Line 28: Line 28:
 
==ATLIS Tasks==
 
==ATLIS Tasks==
 
=== AIPINJ ===
 
=== AIPINJ ===
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]

Revision as of 21:20, 12 March 2020

This area is related to Injector Upgrade Meetings

Injector upgrade calendar

Run (now - May 6)
Phase 1 (May 6 - end of 2020)
Run (Jan 2021 - Sep 13 2021)
Phase 2 (Sep 13 - end of 2021)

Injector Upgrade Meetings

Link to AIPINJ OneDrive folder

AIPINJ Layouts

Injector Upgrade Documents and Links

Components

200KV 15 deg dipole
200KV gun BPM's
200kV Wien Filter
Injector Solenoids Upgrade
200kV Quadrupoles
200kV PSS Kicker
200kV Prebuncher
200kV Choppers
Vacuum Upgrades

ATLIS Tasks

AIPINJ

Non-AIPINJ