Difference between revisions of "Dec 13, 2022 - CIS Group meeting"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
** JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) [[media:US-Japan-Topics.pptx]] | ** JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) [[media:US-Japan-Topics.pptx]] | ||
** Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun) | ** Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun) | ||
+ | |||
+ | * IPAC'23 | ||
+ | ** Update on abstracts submitted to IPAC'23 related to to e-/e+ R&D at LERF | ||
+ | ** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]] | ||
+ | ** R. Kazimi et al., "Electron Injector for Positron Option at CEBAF" | ||
+ | ** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]] | ||
+ | ** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun" | ||
* FY23 projects - [[media:FY23-ACCCIS-Jobs.docx]] | * FY23 projects - [[media:FY23-ACCCIS-Jobs.docx]] |
Revision as of 18:39, 12 December 2022
Agenda
- Joe announcements
- Updates
- 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos),
- Plan for CEBAF from now until the SAD begins (Shukui, Steve, Riad),
- Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
- JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) media:US-Japan-Topics.pptx
- Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun)
- IPAC'23
- Update on abstracts submitted to IPAC'23 related to to e-/e+ R&D at LERF
- J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
- R. Kazimi et al., "Electron Injector for Positron Option at CEBAF"
- A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
- G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun"
- FY23 projects - media:FY23-ACCCIS-Jobs.docx