Difference between revisions of "Dec 13, 2022 - CIS Group meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
 
** R. Kazimi et al., "Electron Injector for Positron Option at CEBAF"
 
** R. Kazimi et al., "Electron Injector for Positron Option at CEBAF"
 
** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun"
+
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]
  
  
 
* FY23 projects - [[media:FY23-ACCCIS-Jobs.docx]]
 
* FY23 projects - [[media:FY23-ACCCIS-Jobs.docx]]

Revision as of 22:00, 12 December 2022

Agenda

  • Joe announcements
  • Updates
    • 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos),
    • Plan for CEBAF from now until the SAD begins (Shukui, Steve, Riad),
    • Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
    • JLAB/SLAC/KEK e-/e+ R&D proposal (Andriy, Carlos, Joe, Mamun, Reza, Silviu) media:US-Japan-Topics.pptx
    • Plan to irradiate target foils with e- beam and laser at LERF Lab 6 (Andriy, Shukui, Silviu, Sandesh, Mamun)
  • IPAC'23
    • Update on abstracts submitted to IPAC'23 related to to e-/e+ R&D at LERF
    • J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
    • R. Kazimi et al., "Electron Injector for Positron Option at CEBAF"
    • A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
    • G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". media:abstract-1233.pdf