;Re-measure emittance in order to analyze Run 1 conditions (3 hours)
 
;Re-measure emittance in order to analyze Run 1 conditions (3 hours)
  
:* Identified parameters and details for a procedure
+
:* '''February 4, 2015:'''
:* Measured emittance and Twiss for 6.3 MeV/c setup
+
::* Identified parameters and details for a procedure
:* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
+
::* Measured emittance and Twiss for 6.3 MeV/c setup
 +
::* Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
  
 
;Test hardware TOF veto at 31MHz and 62MHz (6 hours)
 
;Test hardware TOF veto at 31MHz and 62MHz (6 hours)
  
 
;Test FADC without TDC (1 hour).
 
;Test FADC without TDC (1 hour).
 +
 
:* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
 
:* '''February 4, 2015:''' Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
  

Revision as of 19:00, 9 February 2015

Listed in order of suggested priority...

Re-measure emittance in order to analyze Run 1 conditions (3 hours)
  • February 4, 2015:
  • Identified parameters and details for a procedure
  • Measured emittance and Twiss for 6.3 MeV/c setup
  • Started emittance and Twiss for 5.5 MeV/c but harp is stuck so test deferred for now
Test hardware TOF veto at 31MHz and 62MHz (6 hours)
Test FADC without TDC (1 hour).
  • February 4, 2015: Added two more laser timing signals to FADC. From Disc 708, OUT signal was connected to FADC Ch10 and OUT_bar was connected to Ch12. The original laser timing signal is still connected to Ch9.
Test background as a function of target ladder position on large target foil (2 hours)
Test Mott delayed operation (1 hour)
a set of 10 runs while changing between No Delay and Delay=8.
Test new Mott DAQ Configurations (1 hour)
SemiIntFast (only readout of fADC250. Blocklevel = 1) and SemiIntBlock (only readout of fADC250. Blocklevel = 50). Measure deadtime with 5 uA on 1 um gold foil.