Difference between revisions of "Feb 2, 2022 - Group meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 10: Line 10:
 
*** Characterize noise on Wien magnets 10 A trims vs. 20 A SCE (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23781)
 
*** Characterize noise on Wien magnets 10 A trims vs. 20 A SCE (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23781)
 
*** Characterize gun kick vs. laser position and gun voltage? (NEEDS ATLIS)
 
*** Characterize gun kick vs. laser position and gun voltage? (NEEDS ATLIS)
** Feb 21 - Apr 28
+
* Feb 21 - Apr 28
*** CIS - Decide if ML laser remains for next run, or backout to GS
+
** CIS - Decide if ML laser remains for next run, or backout to GS
*** CIS - Harp/A2 vacuum job (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23934) => postponed to 2023
+
** CIS - Harp/A2 vacuum job (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23934) => postponed to 2023
*** CIS - Return Mott gold target ladder
+
** CIS - Return Mott gold target ladder
*** CIS - Remove Compton transmission polarimeter magnet/detector & Bubble radiator
+
** CIS - Remove Compton transmission polarimeter magnet/detector & Bubble radiator
*** Install - Remove 5D beam line (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22161)
+
** Install - Remove 5D beam line (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22161)
*** RF - upgrade LLRF 3.0 (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376)
+
** RF - upgrade LLRF 3.0 (https://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376)
** Apr 26 - Jun 8
+
* Apr 26 - Jun 8
*** Prepare cathode - (https://logbooks.jlab.org/entry/3978347)
+
** Prepare cathode - (https://logbooks.jlab.org/entry/3978347)
  
 
==Standing Links==
 
==Standing Links==

Revision as of 10:11, 2 February 2022

Meeting Coordinates

CEBAF SAD Schedule Accelerator Down

Standing Links