Difference between revisions of "February 21, 2019 - Weekly ME Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 17: Line 17:
 
: Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
 
: Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
 
: Gabriel's 200kV upgrade modeling jobs
 
: Gabriel's 200kV upgrade modeling jobs
::Develop CEBAF model that includes small shed, w/ simulations comparing 130kV vs. 200kV  (e.g. to predict and compare w/ measurement when goes to CEBAF...Fall?)
+
::Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV  (to compare at CEBAF when installed?)
::Turn a Wien filter ON in GPT, gain experience with effect on the beam (start w/ 130kV, you can compare w/ measurement at CEBAF)
+
::Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
::Optimize/iterate Jay's original 200KV Wien design to one that will provide needed E/B fields
+
::Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
::Work w/ Alicia to incorporate into the upgrade model of injector, evaluate/optimize optics
 
 
: Josh's Ion-bombardment modeling jobs
 
: Josh's Ion-bombardment modeling jobs

Revision as of 11:46, 20 February 2019

ME Components
Jay's solenoid media:190220_COIL.pdf
Small-shed Gun2 assembly drawing
ME Layouts
Danny Gun region media:190123_gun_to_chopper.pdf
Danny Booster region media:LAYOUT14FEB19.pdf
Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
Joe Gun + Booster notes media:190123_INJ.pptx
UITF Updates
Booster status
Running beam from no-shed electrode
Status of small-shed electrode
Modeling Updates
Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
Gabriel's 200kV upgrade modeling jobs
Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV (to compare at CEBAF when installed?)
Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
Josh's Ion-bombardment modeling jobs