Difference between revisions of "February 21, 2019 - Weekly ME Meeting"

From Ciswikidb
Jump to navigation Jump to search
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
;CEBAF Updates
 +
: April SAD as-found survey of beam injector [[media:190221_SA_request.xlsx]]
 +
: [https://wiki.jlab.org/ciswiki/index.php/Ion_Pump_Power_Supplies_-_February_20,_2019 Vacuum IP PS upgrade]
 +
 +
; UITF Updates
 +
: [https://logbooks.jlab.org/entry/3656725 Recent Booster commissioning on -7,-8]
 +
: Running beam from no-shed electrode
 +
: Status of small-shed electrode polishing
 +
 
;ME Components
 
;ME Components
 
:Jay's solenoid [[media:190220_COIL.pdf]]
 
:Jay's solenoid [[media:190220_COIL.pdf]]
Line 6: Line 15:
 
:Danny Gun region [[media:190123_gun_to_chopper.pdf]]
 
:Danny Gun region [[media:190123_gun_to_chopper.pdf]]
 
:Danny Booster region [[media:LAYOUT14FEB19.pdf]]
 
:Danny Booster region [[media:LAYOUT14FEB19.pdf]]
 +
:Injector CED Booster region [[media:injector_model_ced_values.xlsx]]
 
:Danny updated Reza layout dimensions [[media:Injector upgrade Choppers to Booster v01DM.pptx]]
 
:Danny updated Reza layout dimensions [[media:Injector upgrade Choppers to Booster v01DM.pptx]]
 
:Joe Gun + Booster notes [[media:190123_INJ.pptx]]
 
:Joe Gun + Booster notes [[media:190123_INJ.pptx]]
 
; UITF Updates
 
: Booster status
 
: Running beam from no-shed electrode
 
: Status of small-shed electrode
 
  
 
; Modeling Updates
 
; Modeling Updates
: Gabriel and Josh need to learn how to run existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
+
: Gabriel/Josh learn running existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
: Gabriel's 200kV upgrade modeling jobs
+
: Gabriel's 200kV upgrade studies
 
::Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV  (to compare at CEBAF when installed?)
 
::Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV  (to compare at CEBAF when installed?)
 
::Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
 
::Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
 
::Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
 
::Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
: Josh's Ion-bombardment modeling jobs
+
: Josh's Ion-bombardment studies (*data taken already)
 +
:: *Laser spot size => summer 2017 configuration (tee @ 130kV, ground anode, VWien OFF, '''vs. laser size''')
 +
:: *Wien filter ON/OFF => fall 2017-spring 2018 (tee @ 130kV, ground anode, '''VWien ON vs. OFF''')
 +
:: Bias Anode OFF (Part I) => summer 2019 PREX opportunity (large shed @ 130kV, '''anode OFF''', VWien=ON)
 +
:: Bias Anode ON (Part II) => fall 2019-spring 2020 CREX opportunity (small shed @ 130kV, '''anode ON''', VWien=ON)
 +
:: Gun voltage (bias on/off) => fall SAD 2019 opportunity (small shed @ '''130kV vs. 200kV''', bias=ON/OFF, VWien=OFF)

Latest revision as of 10:03, 21 February 2019

CEBAF Updates
April SAD as-found survey of beam injector media:190221_SA_request.xlsx
Vacuum IP PS upgrade
UITF Updates
Recent Booster commissioning on -7,-8
Running beam from no-shed electrode
Status of small-shed electrode polishing
ME Components
Jay's solenoid media:190220_COIL.pdf
Small-shed Gun2 assembly drawing
ME Layouts
Danny Gun region media:190123_gun_to_chopper.pdf
Danny Booster region media:LAYOUT14FEB19.pdf
Injector CED Booster region media:injector_model_ced_values.xlsx
Danny updated Reza layout dimensions media:Injector upgrade Choppers to Booster v01DM.pptx
Joe Gun + Booster notes media:190123_INJ.pptx
Modeling Updates
Gabriel/Josh learn running existing CEBAF GPT deck from Gun to Chopper (130 kV, cathode no-shed?, anode grounded, solenoids, Jay Wiens?)
Gabriel's 200kV upgrade studies
Incorporate small-shed to CEBAF model, use GPT to compare 130kV vs. 200kV (to compare at CEBAF when installed?)
Optimize HV design for Jay's original 200KV Wien, work w/ Jay to build E/B model and evaluate in GPT, consider optical/operation improvements
Work w/ Alicia to incorporate 200KV Wien models into the CEBAF upgrade deck, for testing layout we want to build
Josh's Ion-bombardment studies (*data taken already)
*Laser spot size => summer 2017 configuration (tee @ 130kV, ground anode, VWien OFF, vs. laser size)
*Wien filter ON/OFF => fall 2017-spring 2018 (tee @ 130kV, ground anode, VWien ON vs. OFF)
Bias Anode OFF (Part I) => summer 2019 PREX opportunity (large shed @ 130kV, anode OFF, VWien=ON)
Bias Anode ON (Part II) => fall 2019-spring 2020 CREX opportunity (small shed @ 130kV, anode ON, VWien=ON)
Gun voltage (bias on/off) => fall SAD 2019 opportunity (small shed @ 130kV vs. 200kV, bias=ON/OFF, VWien=OFF)