Difference between revisions of "GTS Improvement List - Summer 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 67: Line 67:
 
7. Replace all steel parts inside chamber with stainless steel ones.
 
7. Replace all steel parts inside chamber with stainless steel ones.
  
8. Check inside chamber for ferromagnetic materials or dust.  
+
8. Search inside chamber for ferromagnetic materials or dust.  
  
 
9. Clip washers on the front flange ports.
 
9. Clip washers on the front flange ports.

Revision as of 07:25, 14 July 2016

Lasers

1. Replace PSS laser shutter.

2. Put laser attenuator in EPICS.

3. Put ND control in EPICS.

4. Put Verdi control in EPICS.

5. Put pickoff Newport power-meter in EPICS.

6. Install QE scanner and and put controls and readout in EPICS.

7. Install SCAM module and its controls.

8. Install a CW laser (476.3 MHz) and a pulse laser capable of generating 420 nC bunches.


Preparation Chamber

1. Put a shield for RGA (to limit light scattering from RGA filament that causes photoemission from chamber components surface that gets coated with photocathode materials during evaporation.)

2. Redesign for anode ring to mount on a paddle with a bellow (to enable flexibility in operation.)

3. Recharge Sb boat.

4. Clean up view ports that got coated.

5. Redesign for shield paddle motion technique.

6. Add a RAV to isolate IP from chamber.

7. Add a K effusion source.

8. Redesign for top heater to operate with cathode negative bias configuration. Redesign of puck and heater stalk to hold puck by heater stalk, and eliminate need of bottom heater to serve as a transfer point. Need to use ceramic circuit breaker to electrically isolate puck.

9. Replace bottom heater with a view port.

10. Install one steel puck and one hybrid moly/steel puck.

11. Install puck with Fe foil for Kerr measurement


HV Chamber

1. Replace isolated anode feed through with a a longer one that is rated to 5000 V (but first, Gary must check for cathode magnet clearance)

2. Replace leaky gate valve.

3. Replace HV ceramic insulator.

4. Align cathode.

5. Replace HV shed.

6. Replace NEG sheets with NEG modules.

7. Replace all steel parts inside chamber with stainless steel ones.

8. Search inside chamber for ferromagnetic materials or dust.

9. Clip washers on the front flange ports.

10. Replace ion pump connector with right angle one.

11. Flip around downstream high voltage chamber support.


Magnetized Cathode Solenoid

1. Complete Cathode Solenoid Magnet Operational Safety Procedure.


Beamline

1. Install a YAG screen on the third diagnostic cross (instead of the phosphorus screen).

2. Replace camera on ITVGT02.

3. Install slits in first and second diagnostic crosses.

4. Install a Faraday Cup for emittance measurements. Need a new picoammeter.

5. Install 4 more RadiaBeam steerers. Need Trim cards and cables.

6. Install beamline clamps (mounts) for steerers.

7. Install a third beamline solenoid. Need Trim card and cables.

8. Replace glass window on ion pump VIPGT01A with metal blank.

9. Check dump ceramic break shielding.

10. Improve dump LCW cooling (put in MPS?)

11. Degas dump further.


Software and Controls

Enclosure and Control Room

1. Get two new computer monitors for fellt2.

2. Get a second phone line.