Difference between revisions of "GTS meeting 1 12 16"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* Yan's optimized electrostatic design shed for the R30 inverted insulator based on John's design. [[Media:Yan's_Optimised_Shed_for_R30ins.pptx]]
 
* Yan's optimized electrostatic design shed for the R30 inverted insulator based on John's design. [[Media:Yan's_Optimised_Shed_for_R30ins.pptx]]
  
* Update and action items by Phil Adderley about the multi-alkali deposition chamber: [[Media:Phil's comments January 9th multi-alkali.pdf]]
+
* Update and action items by Phil Adderley about the multi-alkali deposition chamber: [[Media:Phil's comments January 9th multi-alkali.docx]]
  
 
* Draft GTS schedule
 
* Draft GTS schedule

Revision as of 11:54, 12 January 2016

  • Draft GTS schedule