GTS meeting 2 28 17

From Ciswikidb
Revision as of 08:46, 28 February 2017 by Suleiman (talk | contribs) (Created page with "1) put voltage on gun with dummy puck, make sure FE is still small at 300kV, bakeout didn't awake field emitters 2) remove dummy puck, insert activated puck, QE scan (top pri...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

1) put voltage on gun with dummy puck, make sure FE is still small at 300kV, bakeout didn't awake field emitters

2) remove dummy puck, insert activated puck, QE scan (top priority)

3) EES: viewers and slits and SCAM and current meters at anode and cup

4) DC power magnets

5) Shukui, get green laser into gun, power meter working, attenutator (whatever that is now) working. Laser boxes and tubes. QE scanner in place and working again

6) software control: magnets, viewers, QE scanner, current meters, Verdi laser?, SCAM, attenuator, ND filter, power meter, how are we getting VL beam?

7) Turn ON gun, make VL beam to cup, insert slits, check functionality, try a little CW, look at ion pumps

8) repeat with magnet! grab viewer image! rejoice

9) then get Yan and Mamun working on thesis data, emittance ad nauseum....