Difference between revisions of "GTS meeting 3 21 17"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
  
* With both solenoids at +2.0 Amps, the solenoid field direction is pointing downstream along the beam path. Figure 2 shows the cabling of the solenoids. The field of the magnetized gun solenoid is pointing out of the photocathode into the downstream direction.
+
* With both solenoids at +2.0 Amps, the solenoid field direction is pointing downstream along the beam path. The field of the magnetized gun solenoid is pointing out of the photocathode into the downstream direction.
  
 
* Conditioned Gun at 300 kV with solenoid at 0 to 300 A, left to do it at: 325, 350, 375, and 400 A.
 
* Conditioned Gun at 300 kV with solenoid at 0 to 300 A, left to do it at: 325, 350, 375, and 400 A.

Revision as of 16:41, 20 March 2017

  • With both solenoids at +2.0 Amps, the solenoid field direction is pointing downstream along the beam path. The field of the magnetized gun solenoid is pointing out of the photocathode into the downstream direction.
  • Conditioned Gun at 300 kV with solenoid at 0 to 300 A, left to do it at: 325, 350, 375, and 400 A.
  • Plan for next week (March 27, 2017):
  1. Monday, Tuesday and Wednesday: open in morning to install beamline but close in afternoon to run beam
  2. Thursday and Friday open all day for beamline bake