Difference between revisions of "GTS meeting 4 26 16"

From Ciswikidb
Jump to navigation Jump to search
Line 8: Line 8:
 
* Magnets
 
* Magnets
 
**The correctors have been installed int he beam line
 
**The correctors have been installed int he beam line
**Software (G. Croke) has provided controls for running the GTS in rack FL05B10
+
**Software (G. Croke) has provided controls for running the GTS in rack FL05B10, [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php]
 
**[[File:Radiabeam corrector in beamline.jpg]]
 
**[[File:Radiabeam corrector in beamline.jpg]]
  

Revision as of 09:23, 26 April 2016

  • Mamun made the first multi-alkali photocathode in the GTS!
    • There is about 1 micro-Amp of photocurrent when illuminated with the laser.
    • The photocathode shows photocurrent when ambient light enters the chamber through uncovered viewports, and when the RGA filament is turned on.
    • Cathode puck ready for activation.jpg
    • Ready to make cathodes.jpg
    • Laser preliminary setup.jpg
  • Magnets
    • The correctors have been installed int he beam line
    • Software (G. Croke) has provided controls for running the GTS in rack FL05B10, [1]
    • Radiabeam corrector in beamline.jpg
  • Viewers
    • Functional. They are the point where they need the EPICS screen interface to drive them in/out.
    • Joe Gubeli, Chris Gould and K. Jordan are working on the cameras.
  • Dump
    • Electrically isolated
    • Lead shield 'case' is now in the GTS. Will bring Vashek to check it out.
    • Shukui lent us a chiller, still needs to be connected