Difference between revisions of "GTS meeting 5 02 17"

From Ciswikidb
Jump to navigation Jump to search
Line 24: Line 24:
 
== Beam Gap Clearing ==
 
== Beam Gap Clearing ==
 
*An alternative to applying electric field (bias) is removing intrinsic electric field (beam)...
 
*An alternative to applying electric field (bias) is removing intrinsic electric field (beam)...
: Beam 'off' time of ~few microseconds w/ rep rate at least greater than ~100 Hz should do OK [[File:CLEARING-GAP.JPG]]
+
: Beam 'off' time of ~few microseconds w/ rep rate at least greater than ~100 Hz should do OK
:: Spinning disk?
 
 
:: Additional 'do something' half-wave plate within tune mode generator + User mode...
 
:: Additional 'do something' half-wave plate within tune mode generator + User mode...
 +
:: Spinning optical chopper ?
 +
[[File:CLEARING-GAP.JPG]]
  
 
== Ion Precipitators ==
 
== Ion Precipitators ==

Revision as of 12:33, 2 May 2017

Attempted to run at 1 mA

  1. Ran for few seconds before a HV arc. QE dropped by a factor of 2.
  2. Ran again for 1.5 hours with ion-precipitators on (?) before a HV arc. QE dropped by another factor of 2.


List of Tasks (Down Monday – Wednesday)

  1. Re-activate photocathode with 3 mm active area
  2. Degas dump with NEGs at 2 Amps AC on for ion pumps to take vacuum load
  3. Laser ND Filters:
    1. Wheel filters are physically out of laser path (cannot be used).
    2. ND filter with In/Out box in GTS control room can still be used. Is has ND1 filter (a factor of 10).
    3. Shukui installed ND3 filter on spare servo motor 2. We should start using this ND filter. It is now on the Tool Screen.
  4. Instrument wire scanner
  5. Install WiFi access point and enable JMenu on PC in GTS cave
  6. Why is Dump/FC picoammeter reading is noisy? up to 20 nA.
  7. Hi-pot VIPGT06
  8. SCAM VL LINE SYNC frequency is not 60 Hz? Need 60 Hz Beam Sync Chassis. Will run with "FREE RUN" mode at 60 Hz.
  9. Put ND filter in front of ITVGT06 and mount camera on the floor.


Beta Calculations

media:Sajini_April2017_Beta_calculations.pdf

Beam Gap Clearing

  • An alternative to applying electric field (bias) is removing intrinsic electric field (beam)...
Beam 'off' time of ~few microseconds w/ rep rate at least greater than ~100 Hz should do OK
Additional 'do something' half-wave plate within tune mode generator + User mode...
Spinning optical chopper ?

CLEARING-GAP.JPG

Ion Precipitators

  1. ion collectors and anode current
  2. The downstream ion collector was wired incorrectly
  3. This is a sketch of the internals of the downstream ion collector VICGT06
  4. Sketch of ion colelcotr internals VICGT06.jpg
  5. These are Cornell's results
  6. Cornell ion clearing results with electrode voltage equation.jpg
  7. Grames paper on anode bias: Media:Grames_PST07_final.pdf
  8. Pozdeyev PAC 2007 ion trapping: Media:Pozdeyev.PDF
  9. Cornell PRAB paper on ion clearing electrodes: Media:Cornell ion colelctors PhysRevAccelBeams.19.034201.pdf
  10. Gabriel's calculation (POISSON model) of the voltage needed in upstream ion collector (VICGT04, wire sticking out of the spool piece): Media:Ion collector VICGT04 wire stikcing out of spool piece.pdf
  11. CEBAF vacuum during 1 mA run
  12. CEBAFvacuum1mA.png
  13. GTS vacuum 1 mA run April 28 2017
  14. Pmceimghkhgmffji.png
  15. GTS 1 mA run also tripped 1.5 hour July 11 2016
  16. Slide09.jpg