GTS meeting 6 18 18

From Ciswikidb
Revision as of 07:37, 25 June 2018 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • GTS updated plan [1]
- Beamline magnets when Gun Solenoid at 400 Amps [2]


  • Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
  1. 30 minutes Sb deposition (heat cleaning again before second attempt, puck was too hot during activation)
  2. 60 minutes Sb deposition (heat cleaned, to be activated today)
  3. 90 minutes Sb deposition (completed)
  4. 10 minutes Sb deposition (done, presented in IPAC'18)