GTS meeting 8 30 16

From Ciswikidb
Revision as of 13:44, 30 August 2016 by Chgarcia (talk | contribs)
Jump to navigation Jump to search
  • The gun and prep chamber have been vented, the gun removed and taken to the clean room in TL 1137 for refurbishing.
  • Mamun and Yan are working on the cathode prep chamber, removing viewports for cleaning, stalk for modification, etc.
    • Mamun has an idea for holding the puck with the top heater, this would allow for biasing the cathode and for full adjustment of the gap between the puck and the effusion source. D. Machie is looking into this...he needs a charge code....
  • The gate valve between the gun and the prep chamber has been removed also and taken to TL 1137 for repairs, as it leaks through.
  • The trim cards powering the magnets have been removed, and J. Delk disconnected the solenoids and steering coils.
  • Bubba and Phil moved the beam line up against the wall.
  • John is working on the HVPS R350 socket and un-shorting the conditioning resistor, found tracking on the R350 socket
  • Starting shutdown for repairs and magent installation.jpg
  • Bubba has 'a' gun in the back of this truck.jpg