Difference between revisions of "GTS meeting 9 11 17"

From Ciswikidb
Jump to navigation Jump to search
 
Line 2: Line 2:
  
  
* Sajini - Differential Orbits study: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx]]
+
* Sajini - Differential Orbits study:
 +
:: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.pdf]]
 +
:: [[media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx]]
  
  

Latest revision as of 10:42, 11 September 2017

  • High current runs


  • Sajini - Differential Orbits study:
media:Sajini_different_orbits-corrector_settings_11Sept2017.pdf
media:Sajini_different_orbits-corrector_settings_11Sept2017.xlsx


  • Shutdown Plan:
  1. Install new YAG screen at viewer 3
  2. Fix existing harp and install 20 µm tungsten wire
  3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
  4. Replace leaky vent valve
  5. Replace bad ion pump
  6. Activate new photocathode (new puck): 5 mm active area at center or full active area?


  • Next Shutdown – December 2017:
  1. Install TE011 cavity