Difference between revisions of "June 17, 2020 - 200 kV gun options"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
#Take a few days to HV condition | #Take a few days to HV condition | ||
#Try the new small shed electrode in, bake, HV condition | #Try the new small shed electrode in, bake, HV condition | ||
− | #Replace with | + | #Replace HV chamber with larger 300 kV HV chamber (TL-1137 or GTS) |
;Carlos' slides... | ;Carlos' slides... |
Revision as of 09:56, 17 June 2020
- Three options in September
- Take a few days to HV condition
- Try the new small shed electrode in, bake, HV condition
- Replace HV chamber with larger 300 kV HV chamber (TL-1137 or GTS)
- Carlos' slides...
- Our last planning meeting (January 8, 2020)
- Plan and time line media:200108_plan.docx media:200108_plan.pdf
- Mamun's analysis of SS small shield processed w/ Kr at CEBAF media:200108_Mamun.pptx