Kerr - July 28, 2016

From Ciswikidb
Revision as of 16:16, 28 July 2016 by Bhardy (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Today we Aligned the laser and the whole setup at the MMF and are ready to start making measurements.

  • Current vs Kerr signals Steel and Moly
  • Current vs Kerr signals steel moly and change in X axis
  • Change in Z Kerr signal and Current measurements
Layout of optics from above. Stage is able to be moved in the x-axis +-10mm
LAviewpoint.jpeg



Excel Null measurements no Current --> media:MMFnull.xlsx