Line 28: | Line 28: | ||
; Other magnet jobs | ; Other magnet jobs | ||
− | *(JM) Complete magnet table I circulated | + | * '''Done''' (JM) Complete magnet table I circulated |
*(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary | *(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary | ||
*(RS/GC) FG solenoid special hysteresis for Gary | *(RS/GC) FG solenoid special hysteresis for Gary |
Revision as of 12:17, 1 March 2021
Meeting Info =
We will kick-off the Phase 1 magnet installation following Steve's Monday at 1330 SAD discussion. https://bluejeans.com/569476853
Agenda
- Installation status
- Schedule
- Transition from vac/mech to girder hook-ups planned to begin April 5 (5 weeks from today)
- We may be ready early by 1 or 2 weeks (no sooner than mid-March)
- Total of 4 weeks are allocated for girder hook-ups (Apr 5 - Apr 30) w/ HCO/System readiness for everything up to FC#2
- Preliminary Songsheet
- Updated as of Feb 23 on the upgrade home page => CEBAF Injector Upgrade
- What to expect in tunnel?
- Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
- There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
- Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable trays (above & on girder) + 3 cable bundle drops (Y, Laser, Chopper)
- DC/Magnet Jobs
- Spreadsheet with magnet information updated as of Mar 1 media:210301_Phase1_Magnet_Summary.xlsx
- Software Jobs
- CED
- Apps
- Screens
- What else for software?
- Other magnet jobs
- Done (JM) Complete magnet table I circulated
- (JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
- (RS/GC) FG solenoid special hysteresis for Gary
- (RS/MJ) Magnet info for Inj Steer spin calculations
- (JM/JG) Decision on spare DR fabrication and alignment
- (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
- (LL/JM) Second QW measurement, what's the scope here?
- (JM) When is the rotating coil stand ready?
- (JM/LL) Reconciling MHD discrepancy
- (LL) Report on QW
- (LL) Report on HD
- (LL) Report on PSS kicker
- CIS Magnet Jobs
- Plans
- Jobs list => Phase 1 area on the upgrade home page => CEBAF Injector Upgrade
- Meet in 2 weeks?