Difference between revisions of "March 11, 2017 - Summer SAD Kickoff Meeting"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* Injector upgrade big picture and this summer's work [[media:170310_CIU.pptx]] | * Injector upgrade big picture and this summer's work [[media:170310_CIU.pptx]] | ||
+ | |||
+ | * [http://journals.aps.org/prab/pdf/10.1103/PhysRevSTAB.13.010101 Load-locked dc high voltage GaAs photogun with an inverted-geometry ceramic insulator] | ||
* Carlos Hernández, Gabriel Palacios "Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade" - [[media:170310_Gabriel.pptx]] | * Carlos Hernández, Gabriel Palacios "Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade" - [[media:170310_Gabriel.pptx]] |
Revision as of 13:41, 10 March 2017
- Injector upgrade big picture and this summer's work media:170310_CIU.pptx
- Carlos Hernández, Gabriel Palacios "Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade" - media:170310_Gabriel.pptx