== Discussion Topics ==
 +
[[Image:170310_gun2.png|thumb]]
  
[[Image:170310_gun2.png|thumb|300px]]
+
* Injector upgrade big picture and this summer's work [[media:170310_CIU.pptx]]
 +
* [http://journals.aps.org/prab/pdf/10.1103/PhysRevSTAB.13.010101 Load-locked dc high voltage GaAs photogun with an inverted-geometry ceramic insulator]
 +
* Carlos Hernández, Gabriel Palacios "Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade" - [[media:170310_Gabriel.pptx]]
  
* Injector upgrade big picture and this summer's work [[media:170310_CIU.pptx]]
+
== Summary ==
 +
1. Carlos/Gabriel/Bubba - Move gun to Test Lab.  Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode.  Close layout/geometry loop between chamber + ME drawings + Poisson.  Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS.  Main goal is electrode design, but give some thought to testing HV chamber before dismantling.
 +
 
 +
2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics
 +
 
 +
3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes sense.
 +
 
 +
4. Joe/Scott - Identify hooks into gun switch software (controls, interlocks), propose modification to allow for gun3 removal
  
* [http://journals.aps.org/prab/pdf/10.1103/PhysRevSTAB.13.010101 Load-locked dc high voltage GaAs photogun with an inverted-geometry ceramic insulator]
+
5. John/Matt/Joe - Move Spellman to Test Lab, restore comm for controls to power itself, then test w/ Ross probe, get TOSP ready for HV to Spellman, vacuum chamber, start discussion w/ software for EPICS application.
  
* Carlos Hernández, Gabriel Palacios "Triple junction 'shed' optimization for the 200kv CEBAF gun upgrade" - [[media:170310_Gabriel.pptx]]
+
6. Carlos/John/software - Deploy a radmon at UITF; use FEL control box?, purchase GM tubes, port software app, add to archiver

Latest revision as of 10:19, 13 March 2017

Discussion Topics

170310 gun2.png

Summary

1. Carlos/Gabriel/Bubba - Move gun to Test Lab. Validate Matt's assertion of plug-and-play of pure alumina vs. conductive insulator, determine stack-up of flange+insulator+electrode. Close layout/geometry loop between chamber + ME drawings + Poisson. Assess stock materials for shed/electrode e.g. Nb/Nb or SS/SS. Main goal is electrode design, but give some thought to testing HV chamber before dismantling.

2. Phil/Joe - See if can locate two large diameter BPM cans, recall existing length of shorter tunnel NEG w/ bellows each end, sketch proposed tube w/ BPM, magnets, does it all fit?, check with Pete about two channels of electronics

3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes sense.

4. Joe/Scott - Identify hooks into gun switch software (controls, interlocks), propose modification to allow for gun3 removal

5. John/Matt/Joe - Move Spellman to Test Lab, restore comm for controls to power itself, then test w/ Ross probe, get TOSP ready for HV to Spellman, vacuum chamber, start discussion w/ software for EPICS application.

6. Carlos/John/software - Deploy a radmon at UITF; use FEL control box?, purchase GM tubes, port software app, add to archiver