Difference between revisions of "March 13, 2017 - 4-Laser/LLRF Installation/Commissioning"
Jump to navigation
Jump to search
(Created page with "Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/...") |
|||
Line 1: | Line 1: | ||
Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/or invite those whom should attend. We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar. | Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/or invite those whom should attend. We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar. | ||
− | + | # [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/16999 Plan for 4-LLRF installation] | |
− | + | # Software controls and screen readiness | |
− | + | # FSD implementation and testing | |
− | + | # First connection to lasers, manual testing 249/499 | |
− | + | # Remote HLLAP control of laser frequency | |
− | + | # Repair bunch length | |
− | + | # Schedule for beam operations | |
− | + | # Beam tests: chopper, bunch length, energy spread | |
− | + | # Dry run for Fall 4-beam ops | |
− | + | # Running during the summer | |
− | + | # Installation of final system | |
− | + | # Any other topic you'd like to discuss |
Revision as of 09:01, 13 March 2017
Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/or invite those whom should attend. We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar.
- Plan for 4-LLRF installation
- Software controls and screen readiness
- FSD implementation and testing
- First connection to lasers, manual testing 249/499
- Remote HLLAP control of laser frequency
- Repair bunch length
- Schedule for beam operations
- Beam tests: chopper, bunch length, energy spread
- Dry run for Fall 4-beam ops
- Running during the summer
- Installation of final system
- Any other topic you'd like to discuss