(Created page with "Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/...")
 
Line 1: Line 1:
 
Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning.  Please come prepared to speak to relevant items below, and/or invite those whom should attend.  We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar.
 
Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning.  Please come prepared to speak to relevant items below, and/or invite those whom should attend.  We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar.
  
1. [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/16999 Plan for 4-LLRF installation]
+
# [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/16999 Plan for 4-LLRF installation]
2. Software controls and screen readiness
+
# Software controls and screen readiness
3. FSD implementation and testing
+
# FSD implementation and testing
4. First connection to lasers, manual testing 249/499
+
# First connection to lasers, manual testing 249/499
5. Remote HLLAP control of laser frequency
+
# Remote HLLAP control of laser frequency
6. Repair bunch length
+
# Repair bunch length
7. Schedule for beam operations
+
# Schedule for beam operations
8. Beam tests: chopper, bunch length, energy spread
+
# Beam tests: chopper, bunch length, energy spread
9. Dry run for Fall 4-beam ops
+
# Dry run for Fall 4-beam ops
10. Running during the summer
+
# Running during the summer
11. Installation of final system  
+
# Installation of final system  
12. Any other topic you'd like to discuss
+
# Any other topic you'd like to discuss

Revision as of 09:01, 13 March 2017

Let's meet Monday March 13th at 11am in the MCC conference room to organize 4-LLRF installation and commissioning. Please come prepared to speak to relevant items below, and/or invite those whom should attend. We'll end the meeting with a ~firm plan that Steve can post to the SAD calendar.

  1. Plan for 4-LLRF installation
  2. Software controls and screen readiness
  3. FSD implementation and testing
  4. First connection to lasers, manual testing 249/499
  5. Remote HLLAP control of laser frequency
  6. Repair bunch length
  7. Schedule for beam operations
  8. Beam tests: chopper, bunch length, energy spread
  9. Dry run for Fall 4-beam ops
  10. Running during the summer
  11. Installation of final system
  12. Any other topic you'd like to discuss