===This Last Week-ish=== | ===This Last Week-ish=== | ||
− | :Bubble Run | + | :'''Bubble Run''' |
::Added new harp w/ temporary controls | ::Added new harp w/ temporary controls | ||
::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP | ::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP | ||
::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable | ::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable | ||
::Added x-ray card to locate beam position | ::Added x-ray card to locate beam position | ||
− | :Upgrade Preparations | + | :'''Upgrade Preparations''' |
::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater | ::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater | ||
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA |
Revision as of 20:35, 10 May 2018
This Last Week-ish
- Bubble Run
- Added new harp w/ temporary controls
- Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
- Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
- Added x-ray card to locate beam position
- Upgrade Preparations
- Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
- Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
- DecaRad installation below outrigger laser table started, heads/cables ready to dress
- S&A begin 200kV electrode measurements 5/11 (per last week's plan)
- PSS dipole measurements vs. expected gun voltage
Next Week and Beyond
- Bubble will continue to run until next Friday @ 8am
- Met w/ Jerry to review PSS integration plans media:SAD18_Upgrade.xlsx
- Upgrade Week 1 media:SAD_180510.docx