May 13, 2016 - Mott Group Meeting
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
We will meet Friday, May 13 at Noon EST in TL-2236.
Updates
- Recap of G4Mott discussion and plans moving forward
- Documenting polarimeter construction
- Slides from meeting with Danny media:160513_Mott_Drawings.pptx
- Marcy, Riad, Joe - Writing TN on the Mott chamber assembly media:MottConstruction-TN_v0.docx
- Status of dipole magnet field
- Status on electron beam measurements for Runs I and II
- Run2 Rates vs Beam Energy and Run1 Predicted Beam Energy media:160513_Moser.pdf
- Important future dates (SPIN 2016, Marty's defense, self-imposed deadline to submit Phys. Rev. C)
Analysis Plan Sequence
- (Joe) - finalize polarimeter geometry and detector acceptance.
- (Joe, Riad) finalize dipole map and compute beam momentum for Runs I/II
- (Xavi) Calculate the final tables of S(E,q,DE,Dq) needed for the simulation and analysis results.
- (Marty) Document Geant4 Mott package, cross-train, implement Xavi's tables for final simulation, provide tech-support
- (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; summarize S_effective vs. thickness for Run I/II
- (Daniel) Revisit asymmetry vs. energy results
- (Daniel, Riad) Rate analysis for Runs I/II
Blue Jeans and Wiki
Toll Free Phone number: 1-888-240-2560 Int'l Call Phone numbers: http://bluejeans.com/numbers Meeting ID: 618889275# Web connection for desktop sharing: https://bluejeans.com/618889275 Wiki: https://wiki.jlab.org/ciswiki/index.php/May_13,_2016_-_Mott_Group_Meeting