Line 14: Line 14:
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
 
::M20 New Assembly 6.00 x 4.500 reducer flange[[media:0.992.pdf]]
  
===Gun3 Removal and Diagnostics Chamber Installation ===
+
===Diagnostics Chamber Installation ===
 
: Second bake and activate week of May 30th => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
 
: Second bake and activate week of May 30th => [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 Remove and replace Gun3 ATLIS task]
 
: Remove VBV3I02 from special interlock and swap PLC for relays
 
: Remove VBV3I02 from special interlock and swap PLC for relays
  
===Spellman HVPS update===
+
===TOSP/Spellman HVPS update===
 
 
===Radmon update===
 
:[https://logbooks.jlab.org/entry/3473167 Installed at CEBAF]
 
:[https://logbooks.jlab.org/entry/3473203 Checked and ready]
 
  
 
=== Summer 2017 SAD Update ===
 
=== Summer 2017 SAD Update ===
 
:[[media:SADCIS_v6.docx]]
 
:[[media:SADCIS_v6.docx]]

Revision as of 20:37, 25 May 2017

200kV Gun

Simulation of the effect of the mesh and the perforated plate media:170525_Mesh.pdf

NEG Tube

We are making 4 BPM's
Shop has materials now and machining (#327755)
...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
...then Pete will perform optical/electrical checks
...then John will perform Gabou map
Final NEG tube design => media:NEGTUBE_MAY03.pdf
M20 Old Assembly Modification media:0990.pdf
M20 New Assembly Can media:0991.pdf
M20 New Assembly 6.00 x 4.500 reducer flangemedia:0.992.pdf

Diagnostics Chamber Installation

Second bake and activate week of May 30th => Remove and replace Gun3 ATLIS task
Remove VBV3I02 from special interlock and swap PLC for relays

TOSP/Spellman HVPS update

Summer 2017 SAD Update

media:SADCIS_v6.docx