May 26, 2017 - 200kV gun upgrade meeting
Jump to navigation
Jump to search
Summer 2017 SAD Update
200kV Gun
- Task and Timeline Gantt chart => media:170421_CHG.pdf
- Simulation of the effect of the mesh and the perforated plate media:170525_Mesh.pdf
NEG Tube
- We are making 4 BPM's
- Shop has materials now and machining (#327755)
- ...then Phil will pick up for weld, 400C bake, leak check, clean, NEG coat
- ...then Pete will perform optical/electrical checks
- ...then John will perform Gabou map
- Final NEG tube design => media:NEGTUBE_MAY03.pdf
- M20 Old Assembly Modification media:0990.pdf
- M20 New Assembly Can media:0991.pdf
- M20 New Assembly 6.00 x 4.500 reducer flangemedia:0.992.pdf
Diagnostics Chamber Installation
- Second bake and activate week of May 30th => Remove and replace Gun3 ATLIS task
- Remove VBV3I02 from special interlock and swap PLC for relays