Difference between revisions of "Meeting 8/11/22 - COMTRA"

From Ciswikidb
Jump to: navigation, search
(Created page with "; Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 99...")
 
 
(7 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
===Installation===
 
===Installation===
 
* Cleaning area has begun, lasts another week or so... then installation jobs could start
 
* Cleaning area has begun, lasts another week or so... then installation jobs could start
 
===Magnet===
 
* Kepco PS - '''due 8/12''' => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412686
 
* Magnet - '''due 7/15''' => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412389
 
 
===DAQ ===
 
* PMT-5R ItoV - on-hand
 
* Cables - '''pull from control room to cave'''
 
 
===Detector===
 
* Collimator - (2) on-hand [[media:JL0015777_Cu_collimator.pdf]] [[File:IMG_20220804_082153706.jpg|thumb]]
 
* Absorbers - (6) on-hand [[media:Absorber - 240 D 001 14_V4.pdf]] [[File:IMG_20220804_082037794.jpg|thumb]]
 
* Boxes - '''(2) shipped DHL, due 8/9'''
 
* BGO - (2) on-hand [[File:IMG_20220804_084436318.jpg|thumb]]
 
* PMT - on-hand [[File:IMG_20220804_081738760.jpg|thumb]]
 
* Bases - '''due 9/15 - comes with Thi in September'''
 
  
 
===Layout===
 
===Layout===
 
* Beamline
 
* Beamline
 
** Radiator - (1) on-hand, '''(1) need for BNL''' [[File:IMG_20220804_084829378.jpg|thumb]]
 
** Radiator - (1) on-hand, '''(1) need for BNL''' [[File:IMG_20220804_084829378.jpg|thumb]]
** ?? zero-length reducer 4.5 to 2.75
+
** '''Need 2.5" spool + reducer to 2-3/4" CF of ceramic'''
** ?? Spool 4.25 lg  [[media:JL0029599-2068-SPOOL 1.50 DIA 2.75 NR X 2.75 ROT REV-, prelim.pdf]]
+
 
* Stands
 
* Stands
 
** UITF PR placed due 7/20 - https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=413412&approvalVersion=1
 
** UITF PR placed due 7/20 - https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=413412&approvalVersion=1
Line 33: Line 16:
 
* Lead
 
* Lead
 
** UITF - (11) 2 X 4 X 4, (2) 2 X 4 X 6, (99) 2 X 4 X 8 [[File:IMG_20220804_084121573.jpg|thumb]]
 
** UITF - (11) 2 X 4 X 4, (2) 2 X 4 X 6, (99) 2 X 4 X 8 [[File:IMG_20220804_084121573.jpg|thumb]]
 +
 +
===Magnet===
 +
* Kepco PS - '''due 8/12''' => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412686
 +
* Magnet
 +
** PR  https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412389
 +
** 8/10/22 - From Sandesh One of the coil has been wound and I will be going to the vendors shop tomorrow to inspect it before they VPI.  [[media:220810_Magnet.jpg]]
 +
 +
===Detector===
 +
* Collimator - (2) on-hand [[media:JL0015777_Cu_collimator.pdf]] [[File:IMG_20220804_082153706.jpg|thumb]]
 +
* Absorbers - (6) on-hand [[media:Absorber - 240 D 001 14_V4.pdf]] [[File:IMG_20220804_082037794.jpg|thumb]]
 +
* Boxes - (2) on hand  [[File:IMG_20220808_132907716.jpg|thumb]]
 +
* BGO - (2) on-hand [[File:IMG_20220804_084436318.jpg|thumb]]
 +
* PMT and mu shields - (4) on-hand [[File:IMG_20220804_081738760.jpg|thumb]]
 +
* Bases - '''due 9/15 - comes with Thi in September'''
 +
 +
===DAQ ===
 +
* PMT-5R ItoV - on-hand
 +
* Cables - '''pull from control room to cave'''
  
 
===Geant4 Model===
 
===Geant4 Model===

Latest revision as of 20:23, 10 August 2022

Thursday's @ 9am EDT by Zoom

Installation

  • Cleaning area has begun, lasts another week or so... then installation jobs could start

Layout

Magnet

Detector

DAQ

  • PMT-5R ItoV - on-hand
  • Cables - pull from control room to cave

Geant4 Model

Documentation