Difference between revisions of "NEG coated 2.5 inch OD BPM's"
Jump to navigation
Jump to search
(Created page with "New BPM's were developed for the 200 kV gun NEG tube beam line. Please see Region 1 released drawings for prints. ;Performance Notes * BPM #1 * BPM #2 * BPM #3 * BPM #4 ;De...") |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | 200 KV BPM's with NEG coating | |
− | + | == ME Design == | |
+ | * can weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]] | ||
+ | * final assembly drawing coming from danny | ||
− | + | == Assembly Sequence == | |
− | + | # Receive can/feedthroughs | |
− | + | # Clean | |
− | + | # Degas | |
− | + | # NEG Coat | |
+ | # Check feedthroughs | ||
+ | # Assemble feedthroughs | ||
+ | # Serialize | ||
+ | # Leak check cans | ||
+ | # Electrical measurement | ||
+ | # Report K's and center | ||
− | + | == Electrical Measurements (K's, center, and linearity plots) == | |
− | |||
− | + | * Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]] | |
− | * | + | * NEG BPM #1 - [[media:NEG_1_fixed.jpg]] [[media:NEG_1_fixed_log.jpg]] [[media:NEG_1_1cmx2cm_lower.pdf]] |
− | * | + | * NEG BPM #2 - [[media:NEG_2_diff_sum.jpg]] [[media:NEG_2_log.jpg]] [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]] |
− | * | + | * NEG BPM #3 - [[media:NEG_3_diff_sum.jpg]] [[media:NEG_3_log.jpg]] |
− | * NEG | + | * NEG BPM #4- [[media:NEG_4.jpg]] [[media:NEG_4_log.jpg]] |
− | * | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 17:28, 14 June 2021
200 KV BPM's with NEG coating
ME Design
- can weldment media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf
- final assembly drawing coming from danny
Assembly Sequence
- Receive can/feedthroughs
- Clean
- Degas
- NEG Coat
- Check feedthroughs
- Assemble feedthroughs
- Serialize
- Leak check cans
- Electrical measurement
- Report K's and center
Electrical Measurements (K's, center, and linearity plots)
- Summary (see NEG BPM 1-4) - media:UITF_SPM_Summary_9_21.ods
- NEG BPM #1 - media:NEG_1_fixed.jpg media:NEG_1_fixed_log.jpg media:NEG_1_1cmx2cm_lower.pdf
- NEG BPM #2 - media:NEG_2_diff_sum.jpg media:NEG_2_log.jpg media:NEG_2_1cmx2cm_upper.pdf, media:NEG_2_1cmx2cm_boresight.pdf
- NEG BPM #3 - media:NEG_3_diff_sum.jpg media:NEG_3_log.jpg
- NEG BPM #4- media:NEG_4.jpg media:NEG_4_log.jpg