Difference between revisions of "November 13, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 11: Line 11:
 
* Injector Steering (spot move, Wiens)
 
* Injector Steering (spot move, Wiens)
 
* Emittance measurement
 
* Emittance measurement
 +
* Lifetime measurement
  
 
== Test Plans ==
 
== Test Plans ==

Revision as of 09:37, 13 November 2013

500 keV Setup

Polarized Source
Beam and Diagnostics
  • Beam to PCUP
  • Beam Modes
  • HVPS calibration
  • QE Measurement
  • Injector Steering (spot move, Wiens)
  • Emittance measurement
  • Lifetime measurement

Test Plans

Brock cavity
Seed laser

Future Plans

Punchlist Media:500keV_punchlist_v2.xlsx
Schedule

Scene Preservation

Slides Media:ScenePreservation.pptx