Line 21: Line 21:
 
:[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble]
 
:[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble]
 
:Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
 
:Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
 +
:[https://logbooks.jlab.org/entry/3625601 Install DBR?]
  
 
===Beyond===
 
===Beyond===

Revision as of 16:22, 13 November 2018

Fall 2018 Run, January 2019 SAD and Beyond...

2018 CEBAF Run

Gun2 lifetime and recent QE scan
Hall B Moller and Beam Energy
Mott measurements
SF6 relief valve leak
Hall A Laser restoring
Vertical Wien PS instability addressed
Helicity board signal vs. setpoint

2018 LERF Status

LERF Driver Laser Enclosure Certified
LERF PSS Certification - Support for Gun and Laser enable

January 2019 CEBAF SAD

Heat/Activate Gun2 Photocathode SLSP
John ordered small tank to top off SF6
Install RTP Pockels cell
Implement 1kV anode safe floating bias supply inline with anode-picoammeter
Fiducialize IHA2D00 for Bubble
Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
Install DBR?

Beyond