=== 2019 ===
 
=== 2019 ===
 
:'''JAN 2 - JAN 22 (3 week SAD/PSS period)'''  [https://accweb.acc.jlab.org/calendar/view-outlook?calendar=1&year=2019&week=1 SAD]
 
:'''JAN 2 - JAN 22 (3 week SAD/PSS period)'''  [https://accweb.acc.jlab.org/calendar/view-outlook?calendar=1&year=2019&week=1 SAD]
::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP]
+
::MUST
::John ordered small tank to top off SF6
+
:::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18580 Heat/Activate Gun2 Photocathode SLSP]
::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell]
+
:::John ordered small tank to top off SF6
::Implement 1kV anode safe floating bias supply inline with anode-picoammeter
+
:::[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18582 Install RTP Pockels cell]
 
::[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble]
 
::[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18562 Fiducialize IHA2D00 for Bubble]
::Restore/HCO helicity magnets?
+
::SHOULD
 
::Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
 
::Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
::[https://logbooks.jlab.org/entry/3625601 Install DBR?]
+
:::Implement 1kV anode safe floating bias supply inline with anode-picoammeter
 +
::LIKE
 +
:::Restore/HCO helicity magnets?
 +
:::[https://logbooks.jlab.org/entry/3625601 Install DBR?]
  
 
: '''JAN 30 - APR 7 (10 week run period)'''
 
: '''JAN 30 - APR 7 (10 week run period)'''

Revision as of 19:25, 15 November 2018

Fall 2018 Run, January 2019 SAD and Beyond...

2018 Fall Run Period

Program through Christmas
Tue 11/20 - Hall A turns off for rest of the year
Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5) => Wien change for B
Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5) => Wien change for B
Thu 12/20 - Machine off at 8am for Holiday break
Gun2 QE
Gun2 lifetime and recent QE scan
Spot Move 11/15/18
High Polarization in Hall B
Hall B Moller and Beam Energy
Mott measurements
SF6 Relief Valve
SF6 relief valve leaky
On-Call Repair
Easy Button Not So Easy
Hall A Laser restoring
Vertical Wien Filter Current Instability
Vertical Wien current instability addressed, but not fixed
Vertical Wien current instability resolved
PQB Studies
Low QE => Large Q Asym
Helicity board signal vs. setpoint
LERF Status
LERF Driver Laser Enclosure Certified
LERF PSS Certification - Support for Gun and Laser enable

2019

JAN 2 - JAN 22 (3 week SAD/PSS period) SAD
MUST
Heat/Activate Gun2 Photocathode SLSP
John ordered small tank to top off SF6
Install RTP Pockels cell
Fiducialize IHA2D00 for Bubble
SHOULD
Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
Implement 1kV anode safe floating bias supply inline with anode-picoammeter
LIKE
Restore/HCO helicity magnets?
Install DBR?
JAN 30 - APR 7 (10 week run period)
Similar to this run with A=30, B=polarized, C=50-70uA, D
Hall A run short until MAR 7, then a 3 day PQB tests a 1-pass 70uA
APR 8 - JUN 2 (8 week SAD period)
PQB Studies?
Early opportunity Gun2 electrode 200KV
JUN 10 - AUG 11 (9 week run period)
Hall A PREX polarized 70uA 1 pass @ 499 MHz
Hall B unpolarized 100nA 5 pass @ 499 MHz
Hall C unpolarized 50-90 uA 3-5 pass @ 499 MHz for 3 weeks
AUG 12 - OCT 25 (11 week SAD period)
Gun2 electrode 200KV
Power Wiens from new PS and HVPS?
NOV 1 - DEC 19 (7 week run period)
Hall A CREX polarized 150uA 1 pass @ 499 MHz
Hall B polarized 5 pass @ 250 MHz
Hall C polarized 30uA 5 pass @ 250 MHz
Hall D 5 pass @ 250 MHz

Beyond