Difference between revisions of "PQB Meeting February 18, 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 19: Line 19:
  
 
3- Brock Cavity in Injector keV Region – a Current Monitor: [[media:Brock_parity.pdf]] [[media:Brock_parity.pptx]]
 
3- Brock Cavity in Injector keV Region – a Current Monitor: [[media:Brock_parity.pdf]] [[media:Brock_parity.pptx]]
  B. Roberts, R.R. Mammei, M. Poelker, J.L. McCarter, "Compact non-invasive electron bunch-length monitor", Phys. Rev. ST Accel. Beams 15, 122802 (2012) [7 pages ],
+
  * B. Roberts, R.R. Mammei, M. Poelker, J.L. McCarter, "''Compact non-invasive electron bunch-length monitor''", [http://prst-ab.aps.org/abstract/PRSTAB/v15/i12/e122802 Phys. Rev. ST Accel. Beams '''15''', 122802 (2012) [7 pages] ], [[media:harmonic resonant cavity_in print.pdf]]

Revision as of 14:11, 13 February 2016

We will meet in TL 2236 Thursday February 18 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Hall A Halo Monitor:

  1. Target is and will remain locked in out position to prevent accidental insertion during the Spring Run.
  2. In summer, target will be removed and and fiducialized to confirm hole positions.
  3. Fast Shut-Down (FSD) system will be completed by August 2016.


2- Plan for and initial results from Spring 2016 beam tests


3- Brock Cavity in Injector keV Region – a Current Monitor: media:Brock_parity.pdf media:Brock_parity.pptx

* B. Roberts, R.R. Mammei, M. Poelker, J.L. McCarter, "Compact non-invasive electron bunch-length monitor", Phys. Rev. ST Accel. Beams 15, 122802 (2012) [7 pages ], media:harmonic resonant cavity_in print.pdf