Difference between revisions of "PQB Meeting July 2, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 24: Line 24:
 
* Hall A Songsheets:  
 
* Hall A Songsheets:  
 
: [[media:12GeVSSAcc31-1.pdf]] (12 GeV)
 
: [[media:12GeVSSAcc31-1.pdf]] (12 GeV)
: [[media:12GeVSSAcc32-1.pdf]] (12 GeV)
+
: [[media:12GeVSSAcc32-1.pdf]] (12 GeV, not published yet)
 
: [[media:12GeVSSAcc33.pdf]] (12 GeV)
 
: [[media:12GeVSSAcc33.pdf]] (12 GeV)
 
: [[media:12GeVSSAcc36.pdf]] (12 GeV)
 
: [[media:12GeVSSAcc36.pdf]] (12 GeV)

Revision as of 16:40, 2 July 2015

We will meet in TL 2236 Thursday July 2 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. List of instrumentation for Hall A beamline: media:HallA_Beamline_Instrumentation_List_June2015.txt
  2. Discussion of Hall A beamline plan and location of newly installed elements: media:pqb_pitt_july_2015.pdf




Notes from this meeting:

  • Will need help from Controls Group (Scott Higgins) with beam modulation software
  • Hall A Beamline Drawing: media:HallA_beamline_drawing.pdf (March 7, 2014)
  • Hall A Songsheets:
media:12GeVSSAcc31-1.pdf (12 GeV)
media:12GeVSSAcc32-1.pdf (12 GeV, not published yet)
media:12GeVSSAcc33.pdf (12 GeV)
media:12GeVSSAcc36.pdf (12 GeV)