Difference between revisions of "PQB Meeting November 5, 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 22: Line 22:
 
# Ed Folts – Hall A beamline progress report:
 
# Ed Folts – Hall A beamline progress report:
 
## Will break vacuum to take pictures of QWeak halo target.
 
## Will break vacuum to take pictures of QWeak halo target.
## May have to move a girder (Quad and two correctors) to free space for Moller polarimeter target (informed Y. Roblin).
+
## May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported changes those in model and everything is fine).

Revision as of 11:00, 5 November 2015

We will meet in TL 2236 Thursday November 5 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

  1. Beam Schedule:
    1. Injector: a lot of opportunities
    2. Accelerator: Nov 9, 2015 – Dec 21
    3. Beam to Hall A: Dec 6 – Dec 21
      1. 900 kW push to Hall-A
      2. 5-pass 11 GeV Mott vs Moeller/Compton: spin dance
      3. 1-pass 2.2 GeV Mott vs Moeller/Compton: spin dance
    4. Accelerator: Jan 28, 2016 – April 14
  2. B. Michaels – Parity DAQs:
    1. Parity DAQ in hall is basically ready.
    2. DAQ at injector is working but Rakitha was going to make some changes to data format to make it easier on our analysis package.
  3. Ed Folts – Hall A beamline progress report:
    1. Will break vacuum to take pictures of QWeak halo target.
    2. May have to move a girder to free space for Moller polarimeter target (Y. Roblin imported changes those in model and everything is fine).