Difference between revisions of "Phase 1"

From Ciswikidb
Jump to navigation Jump to search
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Quick Phase 1 Links ==
+
== Phase 1 Installation ==
  
: ATLIS => [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 ATLIS]
+
: * Design & ME Planning [[AIPINJ - Upgrade Meetings]]
: 8:30 Tools => [[CIS Phase 1 work plans]]
+
: * Dictionary of Phase 1 Components [[Phase 1 Beamline Components]]
: HCO => [[Phase 1 - HCO & Commissioning]]
+
: * Installation ATLIS [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 ATLIS]
: Meetings=> [[AIPINJ - Upgrade Meetings]]
+
: * All Injector SAD Tasks [[Phase 1 & SAD ATLIS Tasks]]
: Schedule Status => [[media:210125_AIPINJ_Schedule.pdf]]
+
: * Daily Toolbox Meeting Space [[CIS Phase 1 work plans]]
 +
: * Phase 1 System Readiness [[Phase 1 System Readiness]]  
 +
: * 5/4 retired [[Phase 1 - HCO & Commissioning]]
  
== Major Phase 1 Beamline Components ==
+
== Phase 1 Beam Commissioning ==
: '''Gun & Vacuum'''
+
;Shift Quick References
::[[200 kV gun]] - Cathode, anode and high voltage system
+
<div class="mw-collapsible mw-collapsed">
::[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps
+
* Tracking / Catch-All Phase I Beam Commissioning ATLis: [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060]
::[[Y-chamber Laser Window]] - Evaluating the best window to minimize birefringence under stress
+
* [https://jeffersonlab.sharepoint.com/sites/CEBAFInjectorSetupProceduresDevelopment Injector Procedures Workspace]
: '''Solenoid Details'''
 
:: Agreed solenoid field direction convention => https://logbooks.jlab.org/entry/3256163
 
:: Phase 1 wiring diagram info => [[media:210419_Magnet_Wiring_v6.docx]]
 
::[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 
::[[FG spin solenoids]]
 
: '''Other Magnets'''
 
::[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
::[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw
 
::[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
 
::[[QW Wien quadrupoles (200 kV upgrade)]] - New quads designed for 200 keV energy, w/ improved magnetic field quality
 
::[[HD steering coils]] - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
 
: '''RF System'''
 
::[[Chopping System (200 kV upgrade)]] - Choppers get higher power amplifiers, maybe a new chopping chamber
 
::[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
 
::[[LLRF 3.0 Phase 1]]
 
: '''Diagnostics'''
 
::[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
 
::[[200 kV NEG Coated BPM's]] - New BPM's on beam pipe, NEG coated and absolutely mapped
 
::[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
 
::[[Beamline viewers]]
 
  
==ATLIS Tasks==
 
'''Open, complete, re-scheduled statuses updated 3/15/21'''
 
  
;AIPINJ
+
* 8AM Meeting: https://bluejeans.com/569476853
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning]
+
* 830 Injector Morning Toolbox Meeting: https://bluejeans.com/171126028
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22311 Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer]
+
* 1530 Injector Afternoon Toolbox Meeting: https://bluejeans.com/171126028
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22161 Removal/Er-installation of Part of 5D line in Inj.]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21911 Gun high voltage conditioning]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22071 DC Power Support for Injector Upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22201 STAC5 A1 Aperture Epics Controls]
 
  
  
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
+
* On-Call Support: http://opsweb.acc.jlab.org/CSUEApps/weboncall/WebOnCallMain.html
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
+
** Day shift, full on-call support
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
+
** Swing shift, show-stopper on-call support, with maintenance punchlist (please log!) for items that can wait until next day
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53]
+
* SAD Calendar: https://accweb.acc.jlab.org/calendar/
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap]
+
* CEBAF Restart gaant chart: https://www.jlab.org/accel/ops/ganttproject/2021/2021_Recovery_MA_20210414-chart.html
  
  
;CIS SAD Tasks
+
* Injector Quick reference, Rev17beta, Draft 5 [[media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf]]
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
+
* AIPINJ Wiki: [[CEBAF Injector Upgrade]]  
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21920 CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 
* '''Open''' No ATLis [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD]
 
  
 +
</div>
  
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20383 Injector Macropulse/Tune Mode Generator Modification]
+
;Other Docs/Links
 +
<div class="mw-collapsible mw-collapsed">
 +
* [https://wiki.jlab.org/ciswiki/index.php/January_25,_2021_-_Weekly_Commissioning_Meetings 1/25/21 Beam Drivers Preliminary Meeting]
 +
* (5/4/21) Phase 1 Settings for 130kV [[media:UIPhase1Settings130kV_2021.pdf]]
 +
* 3/16/21 Beam Drivers Meeting Slides [[media:BeamDrivers_Pt2_3.16.21.pdf]]
 +
* Injector Group Beam Commissioning Slides [[file:BeamINJphase1v5.pptx]]
 +
* Commissioning Checklist (Grames) [[file:210401_Phase1_Commissioning.docx]]
  
  
;Injector Related SAD Tasks
+
</div>
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22341 SCAM software update]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22130 LLRF Diagnostics and Repairs in the Linacs and Injector]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22100 April 2021 10 Amp System PM Maintenance]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22020 Annual Crane Inspections Site wide May 17- May 27 2021]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21316 VME FSD Master Card Commisioning]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21288 429 mHz Amp & Power supply being pulled for repair]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20271 2020 SAD Injector / North Linac 30 Hz System checks]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21542 PSS CAMAC Relay cards replacement with VME versions for Injector and BSY]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21242 Apply labels to I&C components during 2020 SAD]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21020 Neutron Detector System Installation (SAD 2020)]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20644 UHV Power Supply Replacement (ISB)]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21373 Trim Utility Chassis Upgrade - All CEBAF Trim Racks]
 
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21653 Remove old Sonitrol system hardware from NA and SA]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21696 Shutdown of Panel I-BT in the Injector]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21850 Software Controls PSS Injector and North Linac changes on iocsoftsafe2]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21912 Perform Basic PM of 45 MeV spectrometer Power Supply]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20311 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21981 iocin1 - VME crate replacement]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21379 Study - Site Ground Loop]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21103 Change transformer tap settings - oil filled transformers]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21991 Injector Survey Monuments install]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20972 Remove Old 45MeV Dump and re-Install at End of SAD]
 
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22230 Leak Repairs inside of HPA cabinets (1L02-8, 1L06-8, 1L09, and 0L04)]
 
  
 +
;Typical Commissioning Day
 +
<div class="mw-collapsible mw-collapsed">
 +
For weekdays up to PSS Certification beginning M 5/24: <br>
 +
Lock-up each morning after maintenance punchlist from previous day addressed. <br>
 +
4p: Shift turnover from days -> swings. <br>
 +
Each night, 12p, Injector -> Restricted Access. <br><br>
  
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM]
+
</div>
  
 +
;Beam Parameter Scaling (130kV -> 200kV)
 +
<div class="mw-collapsible mw-collapsed">
 +
Table goes here. Forthcoming.
  
* '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
+
</div>
 +
 
 +
;Important Dates
 +
<div class="mw-collapsible mw-collapsed">
 +
 
 +
''updated 5/4/21''
 +
* '''Finalize commissioning plan: April 5th'''
 +
* Injector HCO/SR Complete: 5/10 at the earliest
 +
* Injector Beam Commissioning Begins: 5/10 at the earliest
 +
* NL/Inj -> Stable 2K: 5/21
 +
* Full CEBAF PSS Certification: 5/24 - 6/11
 +
* End of SAD: 7/2
 +
* Resumption of Physics: Mid-August
 +
 
 +
</div>
 +
 
 +
 
 +
===ATLis Testplans===
 +
<div class="mw-collapsible">
 +
''updated 4/26/21''
 +
 
 +
General / Catch-All Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060 Beam Commissioning AIPINJ Phase I (general ATLis)]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21170 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)]
 +
 
 +
 
 +
With-Beam Hardware Commissioning Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22061 22061 PSS Kicker Tests @ 130keV & 200keV]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22080 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22082 22082 AIPINJ: 130/200 keV lifetime measurements]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22313 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV]
 +
 +
 
 +
Beam Commissioning
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22180 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22181 22181 Early Injector Orbit Data Collection Rev. April/May 2021]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182 Set up beam from PCup to FC1 at 130keV]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22183 22183 Beam steer from FC1 to FC2]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22184 22184 Efficacy of Knobs chosen for spot move correction]
 +
 
 +
 
 +
Optics/RF Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22072 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=19784 19784 Test multiwire emittance measurement with beam]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22160 22160 Measure optics at various coil fixture rotation angles for MDR1I02]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22250 22250 0I02 Viewer vs Harp Emittance Measurement]
 +
 
 +
 
 +
Spin/Wien Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22092 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22083 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22330 22330 Measuring time of flight to chopper master slit versus Wien spin angle]
 +
 
 +
 
 +
Parity Quality Beam Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22040 22040 cathode 45deg rotation and spot moves]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22050 22050 130keV sensitivity test]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22051 22051 200keV sensitivity test]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22052 22052 Transmission test gun 200keV]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22053 22053 RTP pos diff feedback convergence FC2 test]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22120 22120 Chopper scan 130keV]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22121 22121 Chopper scan 200keV]
 +
 
 +
 
 +
;ATLiss Arranged in Table
 +
<div class="mw-collapsible mw-collapsed">
 +
[[File:Screen Shot 2021-04-26 at 7.49.40 PM.png | 1001px]]
 +
 
 +
</div>
 +
 
 +
</div>
 +
 
 +
 
 +
=== Beam Commissioning Schedule ===
 +
<div class="mw-collapsible">
 +
'''updated 5/4'''
 +
 
 +
Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />5/10 <br>
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/11
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/12
 +
! style="background-color:#87bdd8;" | Thursday <br />5/13
 +
! style="background-color:#87bdd8;" | Friday<br />5/14
 +
! style="background-color:#87bdd8;" | Sat<br />5/15
 +
! style="background-color:#87bdd8;" | Sun<br />5/16
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br> Plan (ATLis)
 +
| pre-beam checks<br />Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| PSS Kicker Cert (22061)<br />PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, CW (22182)<br /> /or\  Spot Move Knobs (22184)
 +
| Beam Off
 +
| Beam Off
 +
| rowspan="14" | With-beam HCO of <br> all hardware up to 1D;<br />TM setup to FC1/1D, <br> including element centering, <br>correcting for gun kick; <br />Early Injector Orbit <br> Data Collection; <br />Spot move knobs;<br />CW Setup to FC1?
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| Grames
 +
|
 +
| Grames
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| Bruker
 +
| Bruker
 +
| Bruker
 +
| Hernandez-Garcia
 +
| Hernandez-Garcia
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| Forman
 +
| Moser
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/10
 +
| 5/11
 +
| 5/12
 +
| 5/13
 +
| 5/14
 +
| 5/15
 +
| 5/16
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, TM (22182)<br />Early Injector Orbit Data (22181)
 +
| PCup -> FC1 @130keV, CW (22182)<br /> /or\,Spot Move Knobs (22184)
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Aiken (both)
 +
| Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
|}
 +
 
 +
 
 +
Beam Commissioning Week #2, if no sliding
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />5/17
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/18
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/19
 +
! style="background-color:#87bdd8;" | Thursday <br />5/20
 +
! style="background-color:#87bdd8;" | Friday<br />5/21
 +
! style="background-color:#87bdd8;" | Sat<br />5/22
 +
! style="background-color:#87bdd8;" | Sun<br />5/23
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plan (ATLis)
 +
| PCup -> FC1 @130keV, CW (22182)<br />/or\  Spot Move Knobs (22184)
 +
| PCup -> FC1 @130keV, CW (22182)<br />PCup vs Gun HVPS Current Cal (22080)
 +
| Warm RF Setup @130keV (22190)
 +
| MDR1I02 Optics vs Rotation (22160)
 +
| 0I02-YAG Emittance Measurement (22250)
 +
| Beam Off
 +
| Beam Off
 +
| rowspan="14" | CW Setup to FC1/1D;<br />Warm RF CW Setup;<br />1I-0I-region Optics<br />measurements;<br />Lifetime measurement?
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| Grames
 +
|
 +
| Grames
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| Bruker
 +
| Bruker
 +
| Bruker
 +
| Hernandez-Garcia
 +
| Hernandez-Garcia
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/17
 +
| 5/18
 +
| 5/19
 +
| 5/20
 +
| 5/21
 +
| 5/22
 +
| 5/23
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| PCup -> FC1 @130keV, CW (22182) <br> ''1I-0I-region qsUtility @130keV (21923)?''
 +
| Warm RF Setup @130keV (22190)
 +
| Warm RF Setup @130keV (22190) <br> ''MDR1I02 Optics vs Rotation (22160)?''
 +
| 1I-0I-region qsUtility @130keV (21923)
 +
| 1I-0I-region qsUtility @130keV (21923)<br /><br />Lifetime Measurement @ 130keV (22082)
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
| Turner
 +
|
 +
| Turner
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
| Turner
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
|}
 +
 
 +
 
 +
'''CEBAF PSS Certifications Week 1/3''' <br> Beam Commissioning Week #3, if no sliding
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday <br />5/24
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/25
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/26
 +
! style="background-color:#87bdd8;" | Thursday <br />5/27
 +
! style="background-color:#87bdd8;" | Friday<br />5/28
 +
! style="background-color:#87bdd8;" | Sat<br />5/29
 +
! style="background-color:#87bdd8;" | Sun<br />5/30
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning<br /> Plans (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/24
 +
| 5/25
 +
| 5/26
 +
| 5/27
 +
| 5/28
 +
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
|}
 +
 
 +
 
 +
'''CEBAF PSS Certifications Week 2/3''' <br> Beam Commissioning Week #4, if no sliding
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday 5/31<br />Memorial Day 🇺🇸
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/1
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/2
 +
! style="background-color:#87bdd8;" | Thursday <br />6/3
 +
! style="background-color:#87bdd8;" | Friday<br />6/4
 +
! style="background-color:#87bdd8;" | Sat<br />6/5
 +
! style="background-color:#87bdd8;" | Sun<br />6/6
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
 +
| No Beam
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| No Beam
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| No beam
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| No Beam
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| No Beam
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/31 🇺🇸
 +
| 6/1
 +
| 6/2
 +
| 6/3
 +
| 6/4
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Merz
 +
| Carlino / Merz
 +
| Carlino / Merz
 +
| style="background-color:#daebe8;" | Carlino / Merz
 +
| style="background-color:#daebe8;" | Carlino / Merz
 +
|}
 +
 
 +
 
 +
'''CEBAF PSS Certifications Week 3/3''' <br> Beam Commissioning Week #5, if no sliding
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday <br />6/7
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/8
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/9
 +
! style="background-color:#87bdd8;" | Thursday <br />6/10
 +
! style="background-color:#87bdd8;" | Friday<br />6/11
 +
! style="background-color:#87bdd8;" | Sat<br />6/12
 +
! style="background-color:#87bdd8;" | Sun<br />6/13
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend? <br> <br> After PSS Certs <br> Beam->FC2 possible
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/7
 +
| 6/8
 +
| 6/9
 +
| 6/10
 +
| 6/11
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Moser / Merz
 +
| Moser / Merz
 +
| Moser / Merz
 +
| style="background-color:#daebe8;" | Moser / Merz
 +
| style="background-color:#daebe8;" | Moser / Merz
 +
|}
 +
 
 +
 
 +
Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/14
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/15
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/16
 +
! style="background-color:#87bdd8;" | Thursday <br />6/17
 +
! style="background-color:#87bdd8;" | Friday<br />6/18
 +
! style="background-color:#87bdd8;" | Sat<br />6/19
 +
! style="background-color:#87bdd8;" | Sun<br />6/20
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/14
 +
| 6/15
 +
| 6/16
 +
| 6/17
 +
| 6/18
 +
| 6/19
 +
| 6/20
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Moser / Merz
 +
| Moser / Merz
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
|}
 +
 
 +
 
 +
Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/21
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/22
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/23
 +
! style="background-color:#87bdd8;" | Thursday <br />6/24
 +
! style="background-color:#87bdd8;" | Friday<br />6/25
 +
! style="background-color:#87bdd8;" | Sat<br />6/26
 +
! style="background-color:#87bdd8;" | Sun<br />6/27
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/21
 +
| 6/22
 +
| 6/23
 +
| 6/24
 +
| 6/25
 +
| 6/26
 +
| 6/27
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
|}
 +
 
 +
 
 +
Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.
 +
 
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/28
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/29
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/30
 +
! style="background-color:#87bdd8;" | Thursday <br />7/1
 +
! style="background-color:#87bdd8;" | Friday<br />7/2
 +
! style="background-color:#87bdd8;" | Sat<br />7/3
 +
! style="background-color:#87bdd8;" | Sun<br />7/4
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/28
 +
| 6/29
 +
| 6/30
 +
| 7/1
 +
| 7/2
 +
| 7/3
 +
| 7/4
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
|}
 +
 
 +
</div>

Revision as of 21:07, 4 May 2021

Phase 1 Installation

* Design & ME Planning AIPINJ - Upgrade Meetings
* Dictionary of Phase 1 Components Phase 1 Beamline Components
* Installation ATLIS Phase 1 ATLIS
* All Injector SAD Tasks Phase 1 & SAD ATLIS Tasks
* Daily Toolbox Meeting Space CIS Phase 1 work plans
* Phase 1 System Readiness Phase 1 System Readiness
* 5/4 retired Phase 1 - HCO & Commissioning

Phase 1 Beam Commissioning

Shift Quick References




Other Docs/Links


Typical Commissioning Day

For weekdays up to PSS Certification beginning M 5/24:
Lock-up each morning after maintenance punchlist from previous day addressed.
4p: Shift turnover from days -> swings.
Each night, 12p, Injector -> Restricted Access.

Beam Parameter Scaling (130kV -> 200kV)

Table goes here. Forthcoming.

Important Dates

updated 5/4/21

  • Finalize commissioning plan: April 5th
  • Injector HCO/SR Complete: 5/10 at the earliest
  • Injector Beam Commissioning Begins: 5/10 at the earliest
  • NL/Inj -> Stable 2K: 5/21
  • Full CEBAF PSS Certification: 5/24 - 6/11
  • End of SAD: 7/2
  • Resumption of Physics: Mid-August


ATLis Testplans

updated 4/26/21

General / Catch-All Test Plans


With-Beam Hardware Commissioning Test Plans


Beam Commissioning


Optics/RF Test Plans


Spin/Wien Test Plans


Parity Quality Beam Test Plans


ATLiss Arranged in Table

Screen Shot 2021-04-26 at 7.49.40 PM.png


Beam Commissioning Schedule

updated 5/4

Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.

DAY Shift Monday
5/10
Tuesday
5/11
Wednesday
5/12
Thursday
5/13
Friday
5/14
Sat
5/15
Sun
5/16
Notes/Goals
Beam Commissioning
Plan (ATLis)
pre-beam checks
Gun->Chopper Commissioning @ 130keV, TM (22180)
Gun->Chopper Commissioning @ 130keV, TM (22180) PSS Kicker Cert (22061)
PCup -> FC1 @130keV, TM (22182)
PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
Beam Off Beam Off With-beam HCO of
all hardware up to 1D;
TM setup to FC1/1D,
including element centering,
correcting for gun kick;
Early Injector Orbit
Data Collection;
Spot move knobs;
CW Setup to FC1?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Bruker Bruker Bruker Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Moser Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/10 5/11 5/12 5/13 5/14 5/15 5/16
Beam Commissioning Plan / ATLis Gun->Chopper Commissioning @ 130keV, TM (22180) Gun->Chopper Commissioning @ 130keV, TM (22180) PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, TM (22182)
Early Injector Orbit Data (22181)
PCup -> FC1 @130keV, CW (22182)
/or\,Spot Move Knobs (22184)
Beam Off Beam Off
Shift Leader Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Deir Deir Deir Deir Deir Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC
CCOC / PD Aiken (both) Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken


Beam Commissioning Week #2, if no sliding

DAY Shift Monday
5/17
Tuesday
5/18
Wednesday
5/19
Thursday
5/20
Friday
5/21
Sat
5/22
Sun
5/23
Notes/Goals
Beam Commissioning
Plan (ATLis)
PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
PCup -> FC1 @130keV, CW (22182)
PCup vs Gun HVPS Current Cal (22080)
Warm RF Setup @130keV (22190) MDR1I02 Optics vs Rotation (22160) 0I02-YAG Emittance Measurement (22250) Beam Off Beam Off CW Setup to FC1/1D;
Warm RF CW Setup;
1I-0I-region Optics
measurements;
Lifetime measurement?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Bruker Bruker Bruker Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Forman Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/17 5/18 5/19 5/20 5/21 5/22 5/23
Beam Commissioning Plan / ATLis PCup -> FC1 @130keV, CW (22182)
1I-0I-region qsUtility @130keV (21923)?
Warm RF Setup @130keV (22190) Warm RF Setup @130keV (22190)
MDR1I02 Optics vs Rotation (22160)?
1I-0I-region qsUtility @130keV (21923) 1I-0I-region qsUtility @130keV (21923)

Lifetime Measurement @ 130keV (22082)
Beam Off Beam Off
Shift Leader Turner Turner Beam Off Beam Off
Scientist #2 Turner Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Anthony Anthony Anthony Anthony Anthony Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 Beam Off Beam Off
CCOC / PD Merz / Aiken Merz / Aiken Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson


CEBAF PSS Certifications Week 1/3
Beam Commissioning Week #3, if no sliding

DAY Shift
Monday
5/24
Tuesday
5/25
Wednesday
5/26
Thursday
5/27
Friday
5/28
Sat
5/29
Sun
5/30
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/24 5/25 5/26 5/27 5/28 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Merz / Frierson Merz / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson


CEBAF PSS Certifications Week 2/3
Beam Commissioning Week #4, if no sliding

DAY Shift
Monday 5/31
Memorial Day 🇺🇸
Tuesday
6/1
Wednesday
6/2
Thursday
6/3
Friday
6/4
Sat
6/5
Sun
6/6
Notes/Goals
Beam Commissioning
Plans (ATLis)
No Beam TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader No Beam Beam Off? / TBD Beam Off? / TBD
Scientist #2 No beam Beam Off? / TBD Beam Off? / TBD
Ops Inj Support No Beam TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper No Beam Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/31 🇺🇸 6/1 6/2 6/3 6/4 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz


CEBAF PSS Certifications Week 3/3
Beam Commissioning Week #5, if no sliding

DAY Shift
Monday
6/7
Tuesday
6/8
Wednesday
6/9
Thursday
6/10
Friday
6/11
Sat
6/12
Sun
6/13
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?

After PSS Certs
Beam->FC2 possible
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 6/7 6/8 6/9 6/10 6/11 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Moser / Merz Moser / Merz Moser / Merz Moser / Merz Moser / Merz


Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.

DAY Shift Monday
6/14
Tuesday
6/15
Wednesday
6/16
Thursday
6/17
Friday
6/18
Sat
6/19
Sun
6/20
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Merz Moser / Merz Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino


Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.

DAY Shift Monday
6/21
Tuesday
6/22
Wednesday
6/23
Thursday
6/24
Friday
6/25
Sat
6/26
Sun
6/27
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/21 6/22 6/23 6/24 6/25 6/26 6/27
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Carlino Moser / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino


Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.

DAY Shift Monday
6/28
Tuesday
6/29
Wednesday
6/30
Thursday
7/1
Friday
7/2
Sat
7/3
Sun
7/4
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/28 6/29 6/30 7/1 7/2 7/3 7/4
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD TBD / Carlino TBD / Carlino TBD / TBD TBD / TBD TBD / TBD TBD / TBD TBD / TBD