By Nov. 9th the following things MUST be accomplished. | By Nov. 9th the following things MUST be accomplished. | ||
− | + | #CW beam to the inline dump 85uA from A laser, 1uA from the D laser | |
− | + | #Wien setup for alignment of polarization to Hall-A on 5-pass | |
− | + | #Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6 | |
− | + | #Beam matched in the inj. chicane, ready for transport into the NL. | |
− | + | #All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane | |
− | + | #RF calibration tool fully developed (anticipate Nov. 2-7 DAYS) | |
− | + | #quad centering tool fully developed (anticipate Nov. 2-7 DAYS) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]] | Injector Tests and Calendar [[media:150929_InjectorTestList.xlsx]] [[media:150929_InjectorTestList.pdf]] |
Revision as of 11:28, 30 September 2015
By Nov. 9th the following things MUST be accomplished.
#CW beam to the inline dump 85uA from A laser, 1uA from the D laser #Wien setup for alignment of polarization to Hall-A on 5-pass #Quads, solenoids centered (where appropriate) and the determined BPMs SOF loaded, see item 6 #Beam matched in the inj. chicane, ready for transport into the NL. #All lasers should produce beam with the same TWISS/emittance values as measured in the inj. chicane #RF calibration tool fully developed (anticipate Nov. 2-7 DAYS) #quad centering tool fully developed (anticipate Nov. 2-7 DAYS)
Injector Tests and Calendar media:150929_InjectorTestList.xlsx media:150929_InjectorTestList.pdf